X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204092414000

Well Details

Well ID: 0204092414000
Loading map...
Location: 00/14-24-020-09W4/0
Location Alias: 00/14-24-20-09 W4M
Location Alias 2: 00/14-24-020-09 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 09
Section: 24
County/Municipality: Special Areas No. 2
Well Name: CNRL JENNER 14-24-20-9
Operator Name: Canadian Natural Resources Limited
License Number: 0053909
License Date: 1975-06-17
License Status: Issued
Spud Date: 1975-06-28
Final Drill Date: 1975-06-30
Well Total Depth: 527.30 m
Surface Hole Latitude: 50.714271
Surface Hole Longitude: -111.124502

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-06-17 Obtained License
1975-06-30 Finished Drilling
1975-06-30 Production Casing Operation Performed
1975-09-22 Perforation Treatment Performed - Bullet Perforation
1975-09-22 Perforation Treatment Performed - Fractured
1975-09-23 Perforation Treatment Performed - Bullet Perforation
1975-09-23 Perforation Treatment Performed - Fractured
1975-09-23 Perforation Treatment Performed - Selective Bullet Perforations
1976-02-23 Well Mode changed to Drilled and Cased
1976-08-12 Well Began Production
1976-08-12 Well Fluid changed to Gas
1976-08-12 Well Mode changed to Flowing
2016-02-29 Well Fluid changed to Gas
2016-02-29 Well Mode changed to Suspended
2016-08-21 Well Fluid changed to Gas
2016-08-21 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-09-22 Bullet Perforation 444.40 445.00 13
1975-09-23 Selective Bullet Perforations 341.70 343.50 0
1975-09-23 Selective Bullet Perforations 365.20 368.20 0
1975-09-23 Selective Bullet Perforations 369.10 369.40 0
1975-09-23 Bullet Perforation 371.90 372.50 3
1975-09-23 Selective Bullet Perforations 373.10 373.70 0
1975-09-23 Selective Bullet Perforations 374.00 374.60 0
1975-09-23 Selective Bullet Perforations 375.20 378.30 0
1975-09-23 Selective Bullet Perforations 378.60 378.90 0
1975-09-23 Bullet Perforation 379.50 381.00 3
1975-09-23 Selective Bullet Perforations 381.30 381.90 0
1975-09-22 Bullet Perforation 445.00 445.60 20
1975-09-23 Selective Bullet Perforations 382.50 382.80 0
1975-09-23 Selective Bullet Perforations 383.10 384.00 0
1975-09-23 Selective Bullet Perforations 384.40 394.10 0
1975-09-23 Fracture 306.90 394.10 0
1975-09-22 Bullet Perforation 445.60 446.20 13
1975-09-22 Bullet Perforation 446.20 446.50 7
1975-09-22 Fracture 444.40 445.00 0
1975-09-23 Selective Bullet Perforations 351.10 351.40 0
1975-09-23 Selective Bullet Perforations 353.60 355.10 0
1975-09-23 Selective Bullet Perforations 355.70 362.10 0
1975-09-23 Selective Bullet Perforations 306.90 319.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 3159 0.0 0.0 0.0
1977 6709 0.0 0.0 0.0
1978 6103 0.0 0.0 0.0
1979 6224 0.0 0.0 0.0
1980 5174 0.0 0.0 0.0
1981 6373 0.0 0.0 0.0
1982 5330 0.0 0.0 0.0
1983 6832 0.0 0.0 0.0
1984 8633 0.0 0.0 0.0
1985 8082 0.0 0.0 0.0
1986 7267 0.0 0.0 0.0
1987 8743 0.0 0.0 0.0
1988 8698 0.0 0.0 0.0
1989 8545 0.0 0.0 0.0
1990 8417 0.0 0.0 0.0
1991 8730 0.0 0.0 0.0
1992 8713 0.0 0.0 0.0
1993 8707 0.0 0.0 0.0
1994 8680 0.0 0.0 0.0
1995 8736 0.0 0.0 0.0
1996 6994 0.0 0.0 0.0
1997 7412 0.0 0.0 0.0
1998 8555 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 4031 0.0 0.0 0.0
2002 7127 0.0 0.0 0.0
2009 1464 0.0 0.0 0.0
2010 7967 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8759 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 648 0.0 0.0 0.0
2016 3192 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8639 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 936 0.0 0.0 0.0

For data sources see[5]

References