If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0204083606030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.736201,"lon":-110.990452,"icon":""}]} |
Location: 03/06-36-020-08W4/0 | |
Location Alias: 03/06-36-20-08 W4M | |
Location Alias 2: 03/06-36-020-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 4 | |
Range: 08 | |
Section: 36 | |
County/Municipality: Special Areas No. 2 | |
Well Name: IEI 103 TWIN ATLEE-BUFFALO 6-36-20-8 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0128996 | |
License Date: 1987-10-06 | |
License Status: Abandoned | |
Spud Date: 1987-10-08 | |
Final Drill Date: 1987-10-11 | |
Well Total Depth: 774.00 m | |
Surface Hole Latitude: 50.736201 | |
Surface Hole Longitude: -110.990452 |
Date | Event |
---|---|
1987-10-06 | Obtained License |
1987-10-09 | Surface Casing Operation Performed |
1987-10-11 | Finished Drilling |
1987-10-11 | Well Mode changed to Drilled and Cased |
1987-10-12 | Production Casing Operation Performed |
1987-10-12 | Rig Released |
1987-10-17 | Well Log Performed |
1987-10-22 | Perforation Treatment Performed - Jet Perforation |
1987-11-03 | Well Began Production |
1987-11-03 | Well Fluid changed to Gas |
1987-11-03 | Well Mode changed to Flowing |
1991-11-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-11-12 | Plug Back Performed |
1991-11-12 | Well Abandoned |
1991-11-12 | Well Fluid changed to Gas |
1991-11-12 | Well Log Performed |
1991-11-12 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1987-10-22 | Perforation | 770.00 | 771.50 | 13 |
1991-11-12 | Packing Device Capped w/Cement | 756.00 | 764.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1987 | 1404 | 0.0 | 0.0 | 0.0 |
1988 | 8761 | 0.0 | 0.0 | 0.0 |
1989 | 8727 | 0.0 | 0.0 | 0.0 |
1990 | 8253 | 0.0 | 0.0 | 0.0 |
1991 | 1354 | 0.0 | 0.0 | 0.0 |
For data sources see[5]