X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204083606020

Well Details

Well ID: 0204083606020
Loading map...
Location: 02/06-36-020-08W4/0
Location Alias: 02/06-36-20-08 W4M
Location Alias 2: 02/06-36-020-08 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 08
Section: 36
County/Municipality: Special Areas No. 2
Well Name: IEI 102 TWIN ATLEE-BUFFALO 6-36-20-8
Operator Name: 2969980 Canada Inc.
License Number: 0125936
License Date: 1987-02-20
License Status: Re-Entered
Spud Date: 1987-02-23
Final Drill Date: 1987-02-27
Well Total Depth: 1005.00 m
Surface Hole Latitude: 50.736262
Surface Hole Longitude: -110.990772

For data sources see[1][2]

Well History

Date Event
1987-02-20 Obtained License
1987-02-24 Surface Casing Operation Performed
1987-02-25 Kick Occurred
1987-02-27 Finished Drilling
1987-02-27 Well Log Performed
1987-02-28 Drill Stem Test Performed
1987-03-01 Production Casing Operation Performed
1987-03-01 Rig Released
1987-03-01 Well Mode changed to Drilled and Cased
1987-05-12 Well Log Performed
1987-05-22 Perforation Treatment Performed - Jet Perforation
1987-11-02 Well Began Production
1987-11-02 Well Fluid changed to Gas
1987-11-02 Well Mode changed to Flowing
1988-11-12 Perforation Treatment Performed - Cement Squeeze
1988-11-13 Perforation Treatment Performed - Jet Perforation
1990-12-04 Well Log Performed
1990-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-12-05 Plug Back Performed
1990-12-05 Well Fluid changed to Gas
1990-12-05 Well Log Performed
1990-12-05 Well Mode changed to Abandoned Zone
1990-12-06 Well Log Performed
1990-12-07 Perforation Treatment Performed - Jet Perforation
1990-12-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-12-10 Plug Back Performed
1990-12-10 Well Log Performed
1991-11-13 Well Abandoned
1991-11-13 Well Fluid changed to Gas
1991-11-13 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-05-22 Perforation 947.00 948.00 13
1988-11-12 Cement Squeeze 947.00 948.00 0
1988-11-13 Perforation 942.50 944.00 13
1990-12-05 Packing Device Capped w/Cement 927.00 935.00 0
1990-12-07 Perforation 759.00 762.50 13
1990-12-10 Packing Device Capped w/Cement 745.00 753.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 1421 0.0 0.0 0.0
1988 6506 0.0 0.0 0.0
1989 7539 0.0 0.0 0.0
1990 5377 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1987-02-25 Kick 838.00 838.00

For data sources see[6]

References