X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204083216002

Well Details

Well ID: 0204083216002
Loading map...
Location: 00/16-32-020-08W4/2
Location Alias: 00/16-32-20-08 W4M
Location Alias 2: 00/16-32-020-08 W4/02
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 08
Section: 32
County/Municipality: Special Areas No. 2
Well Name: IMAGINEA JENNER 16-32-20-8
Operator Name: Cor4 Oil Corp.
License Number: 0084128
License Date: 1980-07-14
License Status: Issued
Spud Date: 1980-07-28
Final Drill Date: 1980-07-29
Well Total Depth: 669.00 m
Surface Hole Latitude: 50.746452
Surface Hole Longitude: -111.067164

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-07-14 Obtained License
1980-07-29 Finished Drilling
1980-07-29 Production Casing Operation Performed
1980-07-29 Well Mode changed to Drilled and Cased
1980-11-07 Perforation Treatment Performed - Jet Perforation
1980-11-07 Perforation Treatment Performed - Selective Jet Perforations
1980-11-08 Perforation Treatment Performed - Fractured
1980-11-10 Perforation Treatment Performed - Selective Jet Perforations
1980-11-11 Perforation Treatment Performed - Fractured
1981-11-05 Well Began Production
1981-11-05 Well Fluid changed to Gas
1981-11-05 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-11-07 Perforation 641.80 644.20 5
1980-11-10 Selective Jet Perforations 517.20 558.90 0
1980-11-10 Selective Jet Perforations 560.00 591.20 0
1980-11-10 Selective Jet Perforations 593.10 607.10 0
1980-11-10 Selective Jet Perforations 615.70 616.20 0
1980-11-10 Selective Jet Perforations 383.20 386.70 0
1980-11-10 Selective Jet Perforations 390.60 393.70 0
1980-11-10 Selective Jet Perforations 396.20 401.30 0
1980-11-10 Selective Jet Perforations 402.00 402.60 0
1980-11-10 Selective Jet Perforations 402.80 403.70 0
1980-11-10 Selective Jet Perforations 404.20 404.70 0
1980-11-07 Selective Jet Perforations 645.50 645.90 0
1980-11-10 Selective Jet Perforations 405.20 405.80 0
1980-11-10 Selective Jet Perforations 406.10 407.30 0
1980-11-11 Fracture 383.20 616.20 0
1980-11-07 Selective Jet Perforations 646.20 646.50 0
1980-11-07 Selective Jet Perforations 646.80 647.10 0
1980-11-07 Selective Jet Perforations 647.50 647.50 0
1980-11-08 Fracture 641.80 647.50 0
1980-11-10 Selective Jet Perforations 470.10 473.20 0
1980-11-10 Selective Jet Perforations 473.60 478.40 0
1980-11-10 Selective Jet Perforations 478.90 479.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 1317 0.0 0.0 0.0
1982 4692 0.0 0.0 0.0
1983 3639 0.0 0.0 0.0
1984 4342 0.0 0.0 0.0
1985 5035 0.0 0.0 0.0
1986 4135 0.0 0.0 0.0
1987 2272 0.0 0.0 0.0
1988 2857 0.0 0.0 0.0
1989 5640 0.0 0.0 0.0
1990 3309 0.0 0.0 0.0
1991 6672 0.0 0.0 0.0
1992 8215 0.0 0.0 0.0
1993 8573 0.0 0.0 0.0
1994 8450 0.0 0.0 0.0
1995 8675 0.0 0.0 0.0
1996 8588 0.0 0.0 0.0
1997 8583 0.0 0.0 0.0
1998 8672 0.0 0.0 0.0
1999 8691 0.0 0.0 0.0
2000 8733 0.0 0.0 0.0
2001 8568 0.0 0.0 0.0
2002 8745 0.0 0.0 0.0
2003 8566 0.0 0.0 0.0
2004 8763 0.0 0.0 0.0
2005 8698 0.0 0.0 0.0
2006 8606 0.0 0.0 0.0
2007 8713 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8757 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8728 0.0 0.0 0.0
2018 8015 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References