If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0204083116006 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.745043,"lon":-111.092434,"icon":""}]} |
Location: 00/16-31-020-08W4/6 | |
Location Alias: 00/16-31-20-08 W4M | |
Location Alias 2: 00/16-31-020-08 W4/06 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 4 | |
Range: 08 | |
Section: 31 | |
County/Municipality: Special Areas No. 2 | |
Well Name: IMAGINEA JENNER 16-31-20-8 | |
Operator Name: Cor4 Oil Corp. | |
License Number: 0028919 | |
License Date: 1965-09-07 | |
License Status: Suspension | |
Spud Date: 1965-09-08 | |
Final Drill Date: 1965-09-11 | |
Well Total Depth: 996.10 m | |
Surface Hole Latitude: 50.745043 | |
Surface Hole Longitude: -111.092434 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1965-09-07 | Obtained License |
1965-09-11 | Finished Drilling |
1965-09-11 | Well Mode changed to Drilled and Cased |
1965-09-12 | Drill Stem Test Performed |
1965-09-13 | Production Casing Operation Performed |
1965-09-23 | Perforation Treatment Performed - Bullet Perforation |
1965-10-15 | Perforation Treatment Performed - Cement Squeeze |
1965-10-16 | Perforation Treatment Performed - Bullet Perforation |
1978-10-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-04-04 | Perforation Treatment Performed - Jet Perforation |
1988-08-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-08-22 | Perforation Treatment Performed - Jet Perforation |
1988-08-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-08-23 | Perforation Treatment Performed - Cement Squeeze |
1988-08-23 | Plug Back Performed |
1988-08-26 | Perforation Treatment Performed - Jet Perforation |
1993-12-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-12-02 | Plug Back Performed |
1993-12-03 | Perforation Treatment Performed - Jet Perforation |
1993-12-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-12-04 | Plug Back Performed |
1999-09-08 | Well Log Performed |
1999-09-10 | Perforation Treatment Performed - Jet Perforation |
1999-09-14 | Perforation Treatment Performed - Fractured |
1999-09-16 | Perforation Treatment Performed - Jet Perforation |
1999-09-17 | Perforation Treatment Performed - Fractured |
2008-09-11 | Perforation Treatment Performed - Jet Perforation |
2008-10-01 | Well Began Production |
2008-10-01 | Well Fluid changed to Gas |
2008-10-01 | Well Mode changed to Flowing |
2013-02-01 | Well Fluid changed to Gas |
2013-02-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1965-09-23 | Bullet Perforation | 943.10 | 943.40 | 13 |
1988-08-26 | Perforation | 857.60 | 859.10 | 13 |
1993-12-02 | Packing Device Capped w/Cement | 839.00 | 847.00 | 0 |
1993-12-03 | Perforation | 770.00 | 771.00 | 13 |
1993-12-04 | Packing Device Capped w/Cement | 753.00 | 761.00 | 0 |
1999-09-10 | Perforation | 473.50 | 484.00 | 7 |
1999-09-14 | Fracture | 473.50 | 484.00 | 0 |
1999-09-16 | Perforation | 349.50 | 422.50 | 7 |
1999-09-17 | Fracture | 349.50 | 422.50 | 0 |
2008-09-11 | Perforation | 230.00 | 230.50 | 9 |
1965-10-15 | Cement Squeeze | 943.10 | 943.40 | 0 |
1965-10-16 | Bullet Perforation | 864.40 | 866.20 | 13 |
1978-10-24 | Acid Treatment | 864.40 | 866.20 | 0 |
1988-04-04 | Perforation | 857.60 | 859.20 | 13 |
1988-08-22 | Perforation | 861.40 | 862.40 | 13 |
1988-08-22 | Acid Treatment | 857.60 | 862.40 | 0 |
1988-08-23 | Cement Squeeze | 857.60 | 862.40 | 0 |
1988-08-23 | Packing Device Capped w/Cement | 860.20 | 863.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 572 | 0.0 | 0.0 | 0.0 |
2009 | 6497 | 0.0 | 0.0 | 0.0 |
2010 | 6432 | 0.0 | 0.0 | 0.0 |
2011 | 6876 | 0.0 | 0.0 | 0.0 |
For data sources see[5]