X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204082303000

Well Details

Well ID: 0204082303000
Loading map...
Location: 00/03-23-020-08W4/0
Location Alias: 00/03-23-20-08 W4M
Location Alias 2: 00/03-23-020-08 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 08
Section: 23
County/Municipality: Special Areas No. 2
Well Name: CARDINAL SUFFIELD 3-23-20-8
Operator Name: Cardinal Energy Ltd.
License Number: 0179406
License Date: 1995-07-19
License Status: Issued
Spud Date: 1995-07-22
Final Drill Date: 1995-07-25
Well Total Depth: 970.00 m
Surface Hole Latitude: 50.705118
Surface Hole Longitude: -111.012824

For data sources see[1][2]

Well History

Date Event
1995-07-19 Obtained License
1995-07-22 Surface Casing Operation Performed
1995-07-23 Direction Drilling Operation Performed - Deviate
1995-07-25 Finished Drilling
1995-07-25 Well Log Performed
1995-07-25 Well Mode changed to Drilled and Cased
1995-07-26 Production Casing Operation Performed
1995-07-26 Rig Released
1995-07-31 Perforation Treatment Performed - Jet Perforation
1995-08-09 Perforation Treatment Performed - Jet Perforation
1995-08-25 Well Log Performed
1995-09-04 Well Began Production
1995-09-04 Well Fluid changed to Gas
1995-09-04 Well Mode changed to Flowing
1996-06-01 Well Fluid changed to Gas
1996-06-01 Well Mode changed to Suspended
1998-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-03-12 Plug Back Performed
1998-03-12 Well Fluid changed to Gas
1998-03-12 Well Mode changed to Abandoned Zone
2002-10-22 Perforation Treatment Performed - Cement Squeeze
2002-10-22 Perforation Treatment Performed - Jet Perforation
2002-10-26 Perforation Treatment Performed - Jet Perforation
2002-10-26 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-07-23 516.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-07-31 Perforation 932.50 933.00 13
1995-08-09 Perforation 933.00 934.00 13
1998-03-12 Packing Device Capped w/Cement 920.00 928.00 0
2002-10-22 Perforation 933.00 934.00 13
2002-10-22 Perforation 932.50 933.00 13
2002-10-22 Cement Squeeze 932.50 934.00 0
2002-10-26 Perforation 928.00 930.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 2737 0.0 0.0 0.0
1996 827 0.0 0.0 0.0

For data sources see[6]

References