X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204082114B00

Well Details

Well ID: 0204082114B00
Loading map...
Location: B0/14-21-020-08W4/0
Location Alias: B0/14-21-20-08 W4M
Location Alias 2: B0/14-21-020-08 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 08
Section: 21
County/Municipality: Special Areas No. 2
Well Name: CARDINAL SUFFIELD 14-21-20-8
Operator Name: Cardinal Energy Ltd.
License Number: 0155852
License Date: 1993-01-21
License Status: Suspension
Spud Date: 1993-02-11
Final Drill Date: 1993-02-15
Well Total Depth: 980.00 m
Surface Hole Latitude: 50.714707
Surface Hole Longitude: -111.059950

For data sources see[1][2]

Well History

Date Event
1993-01-21 Obtained License
1993-02-12 Surface Casing Operation Performed
1993-02-13 Direction Drilling Operation Performed - Deviate
1993-02-15 Finished Drilling
1993-02-15 Well Log Performed
1993-02-15 Well Mode changed to Drilled and Cased
1993-02-16 Production Casing Operation Performed
1993-02-16 Rig Released
1993-02-19 Perforation Treatment Performed - Jet Perforation
1993-02-20 Perforation Treatment Performed - Cement Squeeze
1993-02-20 Perforation Treatment Performed - Jet Perforation
1993-03-01 Well Began Production
1993-03-01 Well Fluid changed to Crude Oil
1993-03-01 Well Mode changed to Pumping
1993-03-08 Well Log Performed
1998-06-23 Well Fluid changed to Crude Oil
1998-06-23 Well Mode changed to Suspended
2009-07-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-07-16 Plug Back Performed
2009-07-16 Well Fluid changed to Crude Oil
2009-07-16 Well Log Performed
2009-07-16 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-02-13 503.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-02-19 Perforation 929.50 931.00 13
1993-02-20 Perforation 938.00 939.00 13
1993-02-20 Cement Squeeze 929.50 939.00 0
1993-02-20 Perforation 929.50 931.00 13
2009-07-16 Packing Device Capped w/Cement 900.50 908.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 6853 0.0 0.0 0.0
1994 8550 0.0 0.0 0.0
1995 8548 0.0 0.0 0.0
1996 8512 0.0 0.0 0.0
1997 8571 0.0 0.0 0.0
1998 3406 0.0 0.0 0.0

For data sources see[6]

References