If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0204082113A20 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.715074,"lon":-111.061756,"icon":""}]} |
Location: A2/13-21-020-08W4/0 | |
Location Alias: A2/13-21-20-08 W4M | |
Location Alias 2: A2/13-21-020-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 4 | |
Range: 08 | |
Section: 21 | |
County/Municipality: Special Areas No. 2 | |
Well Name: CARDINAL SUFFIELD 13-21-20-8 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0141247 | |
License Date: 1989-10-11 | |
License Status: Issued | |
Spud Date: 1989-10-15 | |
Final Drill Date: 1989-10-19 | |
Well Total Depth: 933.50 m | |
Surface Hole Latitude: 50.715074 | |
Surface Hole Longitude: -111.061756 |
Date | Event |
---|---|
1989-10-11 | Obtained License |
1989-10-16 | Surface Casing Operation Performed |
1989-10-17 | Direction Drilling Operation Performed - Deviate |
1989-10-19 | Finished Drilling |
1989-10-19 | Well Log Performed |
1989-10-19 | Well Mode changed to Drilled and Cased |
1989-10-20 | Production Casing Operation Performed |
1989-10-20 | Rig Released |
1989-10-23 | Well Began Production |
1989-10-23 | Well Fluid changed to Crude Oil |
1989-10-23 | Well Mode changed to Flowing |
1989-10-24 | Perforation Treatment Performed - Open-Hole Completion |
1991-08-26 | Well Fluid changed to Crude Oil |
1991-08-26 | Well Mode changed to Pumping |
1995-09-01 | Well Type changed to Observation |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1989-10-17 | 543.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-10-24 | Open Hole/Barefoot Completion | 930.00 | 933.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 1506 | 0.0 | 0.0 | 0.0 |
1990 | 8674 | 0.0 | 0.0 | 0.0 |
1991 | 8267 | 0.0 | 0.0 | 0.0 |
1992 | 8721 | 0.0 | 0.0 | 0.0 |
1993 | 8202 | 0.0 | 0.0 | 0.0 |
1994 | 6833 | 0.0 | 0.0 | 0.0 |
For data sources see[6]