If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0204082112000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.712344,"lon":-111.06278,"icon":""}]} |
Location: 00/12-21-020-08W4/0 | |
Location Alias: 00/12-21-20-08 W4M | |
Location Alias 2: 00/12-21-020-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 4 | |
Range: 08 | |
Section: 21 | |
County/Municipality: Special Areas No. 2 | |
Well Name: CARDINAL SUFFIELD 12-21-20-8 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0030842 | |
License Date: 1966-08-17 | |
License Status: Issued | |
Spud Date: 1966-08-31 | |
Final Drill Date: 1966-09-03 | |
Well Total Depth: 985.70 m | |
Surface Hole Latitude: 50.712344 | |
Surface Hole Longitude: -111.062780 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1966-08-17 | Obtained License |
1966-09-03 | Finished Drilling |
1966-09-03 | Well Mode changed to Drilled and Cased |
1966-09-04 | Production Casing Operation Performed |
1966-09-14 | Perforation Treatment Performed - Bullet Perforation |
1966-09-24 | Well Began Production |
1966-09-24 | Well Fluid changed to Crude Oil |
1966-09-24 | Well Mode changed to Flowing |
1969-02-13 | Well Fluid changed to Crude Oil |
1969-02-13 | Well Mode changed to Suspended |
1971-05-20 | Well Fluid changed to Crude Oil |
1971-05-20 | Well Mode changed to Flowing |
1971-07-01 | Well Fluid changed to Crude Oil |
1971-07-01 | Well Mode changed to Pumping |
1976-09-28 | Well Fluid changed to Crude Oil |
1976-09-28 | Well Mode changed to Suspended |
1978-03-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-03-07 | Perforation Treatment Performed - Cement Squeeze |
1978-03-08 | Perforation Treatment Performed - Jet Perforation |
1978-03-08 | Well Log Performed |
1978-03-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-03-16 | Well Fluid changed to Crude Oil |
1978-03-16 | Well Mode changed to Pumping |
1978-03-27 | Well Fluid changed to Crude Oil |
1978-03-27 | Well Mode changed to Suspended |
1987-08-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-08-29 | Perforation Treatment Performed - Cement Squeeze |
1987-08-29 | Perforation Treatment Performed - Jet Perforation |
1987-08-31 | Perforation Treatment Performed - Jet Perforation |
1987-09-07 | Well Fluid changed to Crude Oil |
1987-09-07 | Well Mode changed to Pumping |
1990-02-01 | Well Fluid changed to Crude Oil |
1990-02-01 | Well Mode changed to Suspended |
1994-04-18 | Perforation Treatment Performed - Cement Squeeze |
1994-04-18 | Well Fluid changed to Crude Oil |
1994-04-18 | Well Mode changed to Abandoned Zone |
1994-04-21 | Perforation Treatment Performed - Jet Perforation |
1994-04-21 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1966-09-14 | Bullet Perforation | 924.80 | 927.20 | 13 |
1994-04-18 | Cement Squeeze | 924.50 | 927.50 | 0 |
1994-04-21 | Perforation | 940.00 | 947.00 | 17 |
1978-03-07 | Acid Treatment | 924.80 | 927.20 | 0 |
1978-03-07 | Cement Squeeze | 924.80 | 927.20 | 0 |
1978-03-08 | Perforation | 931.80 | 932.10 | 13 |
1978-03-09 | Acid Treatment | 931.80 | 932.10 | 0 |
1987-08-29 | Perforation | 936.00 | 937.00 | 13 |
1987-08-29 | Acid Treatment | 931.80 | 932.10 | 0 |
1987-08-29 | Cement Squeeze | 931.80 | 937.00 | 0 |
1987-08-31 | Perforation | 924.50 | 927.50 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 4503 | 0.0 | 0.0 | 0.0 |
1971 | 3391 | 0.0 | 0.0 | 0.0 |
1972 | 6259 | 0.0 | 0.0 | 0.0 |
1973 | 8032 | 0.0 | 0.0 | 0.0 |
1974 | 8009 | 0.0 | 0.0 | 0.0 |
1975 | 6881 | 0.0 | 0.0 | 0.0 |
1976 | 4276 | 0.0 | 0.0 | 0.0 |
1978 | 264 | 0.0 | 0.0 | 0.0 |
1987 | 1823 | 0.0 | 0.0 | 0.0 |
For data sources see[5]