X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204082110002

Well Details

Well ID: 0204082110002
Loading map...
Location: 00/10-21-020-08W4/2
Location Alias: 00/10-21-20-08 W4M
Location Alias 2: 00/10-21-020-08 W4/02
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 08
Section: 21
County/Municipality: Special Areas No. 2
Well Name: CARDINAL SUFFIELD 10-21-20-8
Operator Name: Cardinal Energy Ltd.
License Number: 0039516
License Date: 1971-01-05
License Status: Suspension
Spud Date: 1971-01-19
Final Drill Date: 1971-01-24
Well Total Depth: 984.20 m
Surface Hole Latitude: 50.711625
Surface Hole Longitude: -111.053105

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-01-05 Obtained License
1971-01-24 Finished Drilling
1971-01-24 Well Mode changed to Drilled and Cased
1971-01-25 Drill Stem Test Performed
1971-01-26 Drill Stem Test Performed
1971-01-27 Drill Stem Test Performed
1971-01-28 Production Casing Operation Performed
1971-06-21 Perforation Treatment Performed - Jet Perforation
1971-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-06-22 Well Log Performed
1977-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-12-02 Perforation Treatment Performed - Cement Squeeze
1977-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-12-05 Perforation Treatment Performed - Cement Squeeze
1977-12-11 Perforation Treatment Performed - Jet Perforation
1977-12-11 Well Log Performed
1977-12-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-12-13 Perforation Treatment Performed - Jet Perforation
1977-12-15 Perforation Treatment Performed - Cement Squeeze
1977-12-16 Perforation Treatment Performed - Jet Perforation
1978-06-16 Well Began Production
1978-06-16 Well Fluid changed to Gas
1978-06-16 Well Mode changed to Flowing
1980-02-16 Well Fluid changed to Gas
1980-02-16 Well Mode changed to Suspended
1983-11-01 Well Fluid changed to Gas
1983-11-01 Well Mode changed to Flowing
1985-09-09 Well Fluid changed to Gas
1985-09-09 Well Mode changed to Suspended
2008-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-10-16 Plug Back Performed
2008-10-16 Well Fluid changed to Gas
2008-10-16 Well Log Performed
2008-10-16 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-06-21 Perforation 921.70 923.50 13
1977-12-13 Acid Treatment 762.60 763.20 0
1977-12-15 Cement Squeeze 762.60 763.20 0
1977-12-16 Perforation 748.00 748.60 13
1977-12-16 Perforation 758.60 760.20 13
2008-10-16 Packing Device Capped w/Cement 891.00 899.00 0
2008-10-16 Packing Device Capped w/Cement 734.00 742.00 0
1971-06-21 Perforation 924.80 926.60 13
1971-06-22 Acid Treatment 921.70 926.60 0
1977-12-01 Acid Treatment 921.70 926.60 0
1977-12-02 Cement Squeeze 921.70 926.60 0
1977-12-03 Acid Treatment 921.70 926.60 0
1977-12-05 Cement Squeeze 921.70 926.60 0
1977-12-11 Perforation 921.70 927.80 7
1977-12-13 Perforation 762.60 763.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 868 0.0 0.0 0.0
1979 619 0.0 0.0 0.0
1980 349 0.0 0.0 0.0
1983 1296 0.0 0.0 0.0

For data sources see[5]

References