If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0204082107C00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.707327,"lon":-111.053918,"icon":""}]} |
Location: C0/07-21-020-08W4/0 | |
Location Alias: C0/07-21-20-08 W4M | |
Location Alias 2: C0/07-21-020-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 4 | |
Range: 08 | |
Section: 21 | |
County/Municipality: Special Areas No. 2 | |
Well Name: CARDINAL SUFFIELD 7-21-20-8 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0133725 | |
License Date: 1988-05-06 | |
License Status: Issued | |
Spud Date: 1988-05-25 | |
Final Drill Date: 1988-05-29 | |
Well Total Depth: 1084.00 m | |
Surface Hole Latitude: 50.707327 | |
Surface Hole Longitude: -111.053918 |
Date | Event |
---|---|
1988-05-06 | Obtained License |
1988-05-26 | Direction Drilling Operation Performed - Deviate |
1988-05-26 | Surface Casing Operation Performed |
1988-05-29 | Finished Drilling |
1988-05-29 | Well Mode changed to Drilled and Cased |
1988-05-30 | Well Log Performed |
1988-06-01 | Production Casing Operation Performed |
1988-06-01 | Rig Released |
1988-06-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-06-04 | Perforation Treatment Performed - Jet Perforation |
1988-06-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-06-06 | Perforation Treatment Performed - Fractured |
1988-06-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-06-07 | Plug Back Performed |
1988-06-07 | Well Log Performed |
1988-06-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-06-08 | Perforation Treatment Performed - Jet Perforation |
1988-06-08 | Plug Back Performed |
1988-06-09 | Perforation Treatment Performed - Jet Perforation |
1988-06-11 | Well Began Production |
1988-06-11 | Well Fluid changed to Crude Oil |
1988-06-11 | Well Mode changed to Flowing |
1991-02-15 | Well Fluid changed to Crude Oil |
1991-02-15 | Well Mode changed to Pumping |
1991-10-15 | Perforation Treatment Performed - Cement Squeeze |
1991-10-15 | Well Fluid changed to Crude Oil |
1991-10-15 | Well Mode changed to Suspended |
1991-10-17 | Perforation Treatment Performed - Jet Perforation |
1991-10-17 | Well Log Performed |
1991-10-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-11-14 | Perforation Treatment Performed - Fractured |
1991-11-18 | Well Began Injection |
1991-11-18 | Well Fluid changed to Water |
1991-11-18 | Well Type changed to Disposal |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1988-05-26 | 200.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-06-04 | Perforation | 1068.00 | 1071.50 | 13 |
1988-06-09 | Perforation | 966.50 | 967.00 | 13 |
1991-10-15 | Cement Squeeze | 950.00 | 967.00 | 0 |
1991-10-17 | Perforation | 975.00 | 990.00 | 13 |
1991-10-18 | Acid Treatment | 975.00 | 990.00 | 0 |
1991-11-14 | Fracture | 975.00 | 990.00 | 0 |
1988-06-04 | Acid Treatment | 1068.00 | 1071.50 | 0 |
1988-06-05 | Acid Treatment | 1068.00 | 1071.50 | 0 |
1988-06-06 | Fracture | 1068.00 | 1071.50 | 0 |
1988-06-07 | Packing Device Capped w/Cement | 1052.00 | 1060.00 | 0 |
1988-06-08 | Perforation | 1012.00 | 1015.00 | 13 |
1988-06-08 | Packing Device Capped w/Cement | 995.00 | 1003.00 | 0 |
1988-06-09 | Perforation | 950.00 | 954.00 | 13 |
1988-06-09 | Perforation | 965.00 | 966.50 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 4332 | 0.0 | 0.0 | 0.0 |
1989 | 2704 | 0.0 | 0.0 | 0.0 |
1990 | 3056 | 0.0 | 0.0 | 0.0 |
1991 | 0 | 0.0 | 0.0 | 0.0 |
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 0 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
2000 | 0 | 0.0 | 0.0 | 0.0 |
2001 | 0 | 0.0 | 0.0 | 0.0 |
2002 | 0 | 0.0 | 0.0 | 0.0 |
2003 | 0 | 0.0 | 0.0 | 0.0 |
2004 | 0 | 0.0 | 0.0 | 0.0 |
2005 | 0 | 0.0 | 0.0 | 0.0 |
2006 | 0 | 0.0 | 0.0 | 0.0 |
2007 | 0 | 0.0 | 0.0 | 0.0 |
2008 | 0 | 0.0 | 0.0 | 0.0 |
2009 | 0 | 0.0 | 0.0 | 0.0 |
2010 | 0 | 0.0 | 0.0 | 0.0 |
2011 | 0 | 0.0 | 0.0 | 0.0 |
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 0 | 0.0 | 0.0 | 0.0 |
2014 | 0 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]