X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204073006000

Well Details

Well ID: 0204073006000
Loading map...
Location: 00/06-30-020-07W4/0
Location Alias: 00/06-30-20-07 W4M
Location Alias 2: 00/06-30-020-07 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 07
Section: 30
County/Municipality: Special Areas No. 2
Well Name: RIDGEBACK SUFFIELD 6-30-20-7
Operator Name: Ridgeback Resources Inc.
License Number: 0038771
License Date: 1970-09-11
License Status: Suspension
Spud Date: 1970-09-25
Final Drill Date: 1970-09-27
Well Total Depth: 499.90 m
Surface Hole Latitude: 50.721653
Surface Hole Longitude: -110.966215

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-09-11 Obtained License
1970-09-27 Finished Drilling
1970-09-27 Production Casing Operation Performed
1970-09-27 Well Mode changed to Drilled and Cased
1970-10-15 Perforation Treatment Performed - Jet Perforation
1970-10-16 Perforation Treatment Performed - Fractured
1970-11-30 Well Began Production
1970-11-30 Well Fluid changed to Gas
1970-11-30 Well Mode changed to Flowing
2002-09-15 Perforation Treatment Performed - Jet Perforation
2002-09-15 Well Log Performed
2002-09-17 Perforation Treatment Performed - Fractured
2002-09-19 Perforation Treatment Performed - Jet Perforation
2002-09-22 Perforation Treatment Performed - Fractured
2002-09-27 Well Fluid changed to Gas
2002-09-27 Well Mode changed to Flowing
2020-01-01 Well Fluid changed to Gas
2020-01-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-10-15 Perforation 463.90 467.00 13
2002-09-22 Fracture 386.50 392.00 0
2002-09-22 Fracture 375.00 383.00 0
2002-09-22 Fracture 369.50 372.00 0
1970-10-16 Fracture 463.90 467.00 0
2002-09-15 Perforation 462.50 465.30 13
2002-09-17 Fracture 462.50 466.90 0
2002-09-19 Perforation 396.00 402.00 13
2002-09-19 Perforation 386.50 392.00 13
2002-09-19 Perforation 375.00 383.00 13
2002-09-19 Perforation 369.50 372.00 13
2002-09-22 Fracture 396.00 402.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 701 0.0 0.0 0.0
1971 7490 0.0 0.0 0.0
1972 7958 0.0 0.0 0.0
1973 8650 0.0 0.0 0.0
1974 7671 0.0 0.0 0.0
1975 8463 0.0 0.0 0.0
1976 8615 0.0 0.0 0.0
1977 6710 0.0 0.0 0.0
1978 5709 0.0 0.0 0.0
1979 6434 0.0 0.0 0.0
1980 5431 0.0 0.0 0.0
1981 2815 0.0 0.0 0.0
1982 5507 0.0 0.0 0.0
1983 3129 0.0 0.0 0.0
1984 7992 0.0 0.0 0.0
1985 6981 0.0 0.0 0.0
1986 4327 0.0 0.0 0.0
1987 7467 0.0 0.0 0.0
1988 6390 0.0 0.0 0.0
1989 4581 0.0 0.0 0.0
1990 5920 0.0 0.0 0.0
1991 5313 0.0 0.0 0.0
1992 8706 0.0 0.0 0.0
1993 8641 0.0 0.0 0.0
1994 8627 0.0 0.0 0.0
1995 8728 0.0 0.0 0.0
1996 8727 0.0 0.0 0.0
1997 8719 0.0 0.0 0.0
1998 7666 0.0 0.0 0.0
2000 2928 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8471 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 3231 0.0 0.0 0.0
2006 5928 0.0 0.0 0.0
2007 8458 0.0 0.0 0.0
2008 7752 0.0 0.0 0.0
2009 6888 0.0 0.0 0.0
2010 8309 0.0 0.0 0.0
2011 8720 0.0 0.0 0.0
2012 8770 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8709 0.0 0.0 0.0
2015 8571 0.0 0.0 0.0
2016 8403 0.0 0.0 0.0
2017 8743 0.0 0.0 0.0
2018 8663 0.0 0.0 0.0
2019 3599 0.0 0.0 0.0

For data sources see[5]

References