If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0204072403002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.704704,"lon":-110.851743,"icon":""}]} |
Location: 00/03-24-020-07W4/2 | |
Location Alias: 00/03-24-20-07 W4M | |
Location Alias 2: 00/03-24-020-07 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 4 | |
Range: 07 | |
Section: 24 | |
County/Municipality: Special Areas No. 2 | |
Well Name: CARDINAL ATL-BUFF 3-24-20-7 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0206115 | |
License Date: 1997-09-15 | |
License Status: Suspension | |
Spud Date: 1997-09-20 | |
Final Drill Date: 1997-09-23 | |
Well Total Depth: 1055.00 m | |
Surface Hole Latitude: 50.704704 | |
Surface Hole Longitude: -110.851743 |
Date | Event |
---|---|
1997-09-15 | Obtained License |
1997-09-21 | Surface Casing Operation Performed |
1997-09-23 | Finished Drilling |
1997-09-23 | Well Log Performed |
1997-09-23 | Well Mode changed to Drilled and Cased |
1997-09-24 | Production Casing Operation Performed |
1997-09-24 | Rig Released |
1997-10-25 | Perforation Treatment Performed - Jet Perforation |
1997-10-26 | Perforation Treatment Performed - Fractured |
1997-11-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-11-25 | Plug Back Performed |
1998-01-16 | Perforation Treatment Performed - Jet Perforation |
1998-01-16 | Well Mode changed to Drilled and Cased |
2000-09-08 | Well Began Production |
2000-09-08 | Well Fluid changed to Gas |
2000-09-08 | Well Mode changed to Flowing |
2004-07-11 | Well Fluid changed to Gas |
2004-07-11 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-10-25 | Perforation | 1004.50 | 1006.00 | 13 |
1997-10-25 | Perforation | 1015.00 | 1019.00 | 13 |
1997-10-26 | Fracture | 1015.00 | 1019.00 | 0 |
1997-11-25 | Packing Device Capped w/Cement | 1005.50 | 1013.50 | 0 |
1998-01-16 | Perforation | 996.00 | 998.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 2784 | 0.0 | 0.0 | 0.0 |
2001 | 8759 | 0.0 | 0.0 | 0.0 |
2002 | 8756 | 0.0 | 0.0 | 0.0 |
2003 | 8553 | 0.0 | 0.0 | 0.0 |
2004 | 2746 | 0.0 | 0.0 | 0.0 |
For data sources see[5]