If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0204072011002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.71401,"lon":-110.938403,"icon":""}]} |
Location: 00/11-20-020-07W4/2 | |
Location Alias: 00/11-20-20-07 W4M | |
Location Alias 2: 00/11-20-020-07 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 4 | |
Range: 07 | |
Section: 20 | |
County/Municipality: Special Areas No. 2 | |
Well Name: CARDINAL SUFFIELD 11-20-20-7 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0180205 | |
License Date: 1995-08-22 | |
License Status: Suspension | |
Spud Date: 1995-10-25 | |
Final Drill Date: 1995-11-01 | |
Well Total Depth: 1199.00 m | |
Surface Hole Latitude: 50.714010 | |
Surface Hole Longitude: -110.938403 |
Date | Event |
---|---|
1995-08-22 | Obtained License |
1995-10-26 | Surface Casing Operation Performed |
1995-10-28 | Direction Drilling Operation Performed - Horizontal |
1995-10-30 | Production Casing Operation Performed |
1995-11-01 | Direction Drilling Operation Performed - Horizontal |
1995-11-01 | Finished Drilling |
1995-11-03 | Perforation Treatment Performed - Open-Hole Completion |
1995-11-03 | Rig Released |
1995-11-03 | Well Structure changed to Drain |
1995-11-14 | Well Log Performed |
2010-03-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1995-10-28 | 788.00 | Horizontal |
1995-11-01 | 1176.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-11-03 | Open Hole/Barefoot Completion | 1084.00 | 1199.00 | 0 |
2010-03-20 | Packing Device Capped w/Cement | 1000.00 | 1046.00 | 0 |
For data sources see[5]