X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204072010002

Well Details

Well ID: 0204072010002
Loading map...
Location: 00/10-20-020-07W4/2
Location Alias: 00/10-20-20-07 W4M
Location Alias 2: 00/10-20-020-07 W4/02
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 07
Section: 20
County/Municipality: Special Areas No. 2
Well Name: CARDINAL SUFFIELD 6-20-20-7
Operator Name: Cardinal Energy Ltd.
License Number: 0175147
License Date: 1995-01-20
License Status: Suspension
Spud Date: 1995-01-29
Final Drill Date: 1995-02-07
Well Total Depth: 1370.00 m
Surface Hole Latitude: 50.709042
Surface Hole Longitude: -110.944700

For data sources see[1][2]

Well History

Date Event
1995-01-20 Obtained License
1995-01-29 Surface Casing Operation Performed
1995-02-01 Direction Drilling Operation Performed - Horizontal
1995-02-05 Intermediate Casing Operation Performed
1995-02-07 Finished Drilling
1995-02-07 Perforation Treatment Performed - Open-Hole Completion
1995-02-07 Well Mode changed to Drilled and Cased
1995-02-08 Rig Released
1995-02-11 Well Began Production
1995-02-11 Well Fluid changed to Crude Oil
1995-02-11 Well Mode changed to Pumping
1995-03-03 Well Log Performed
1996-09-25 Perforation Treatment Performed - Jet Perforation
2010-06-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-06-26 Plug Back Performed
2010-06-26 Well Fluid changed to Crude Oil
2010-06-26 Well Log Performed
2010-06-26 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-02-01 672.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-02-07 Open Hole/Barefoot Completion 1038.00 1370.00 0
1996-09-25 Perforation 1060.00 1070.00 13
1996-09-25 Perforation 1125.00 1135.00 13
2010-06-26 Packing Device Capped w/Cement 940.00 970.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 6591 0.0 0.0 0.0
1996 7321 0.0 0.0 0.0
1997 8043 0.0 0.0 0.0
1998 8322 0.0 0.0 0.0
1999 8267 0.0 0.0 0.0
2000 8689 0.0 0.0 0.0
2001 8736 0.0 0.0 0.0
2002 7412 0.0 0.0 0.0
2003 8339 0.0 0.0 0.0
2004 6384 0.0 0.0 0.0
2005 2592 0.0 0.0 0.0
2006 5965 0.0 0.0 0.0
2007 8528 0.0 0.0 0.0
2008 8567 0.0 0.0 0.0
2009 7622 0.0 0.0 0.0
2010 3853 0.0 0.0 0.0

For data sources see[6]

References