X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204063114002

Well Details

Well ID: 0204063114002
Loading map...
Location: 00/14-31-020-06W4/2
Location Alias: 00/14-31-20-06 W4M
Location Alias 2: 00/14-31-020-06 W4/02
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 06
Section: 31
County/Municipality: Special Areas No. 2
Well Name: SUCCESSOR ATL-BUFF 14-31-20-6
Operator Name: Scollard Energy Ltd.
License Number: 0182179
License Date: 1995-11-16
License Status: Abandoned
Spud Date: 1995-11-18
Final Drill Date: 1995-11-21
Well Total Depth: 1067.00 m
Surface Hole Latitude: 50.745857
Surface Hole Longitude: -110.827842

For data sources see[1][2]

Well History

Date Event
1995-11-16 Obtained License
1995-11-19 Surface Casing Operation Performed
1995-11-21 Finished Drilling
1995-11-21 Well Log Performed
1995-11-23 Production Casing Operation Performed
1995-11-23 Rig Released
1995-11-25 Perforation Treatment Performed - Jet Perforation
1995-11-25 Well Log Performed
1996-08-02 Well Log Performed
1996-08-03 Perforation Treatment Performed - Jet Perforation
1996-08-03 Well Log Performed
1996-08-06 Well Mode changed to Drilled and Cased
2002-11-04 Well Began Production
2002-11-04 Well Fluid changed to Gas
2002-11-04 Well Mode changed to Flowing
2012-04-04 Well Fluid changed to Gas
2012-04-04 Well Mode changed to Suspended
2019-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-06 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2019-09-06 Plug Back Performed
2019-09-06 Well Fluid changed to Gas
2019-09-06 Well Mode changed to Abandoned Zone
2019-09-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-11-25 Perforation 1014.00 1019.00 17
1996-08-03 Perforation 1009.00 1010.00 17
2019-09-06 Packing Dev Cpd w/Res-Gyp Cem 1010.00 1013.00 0
2019-09-06 Packing Device Capped w/Cement 989.00 997.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 1309 0.0 0.0 0.0
2003 8582 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8596 0.0 0.0 0.0
2006 8689 0.0 0.0 0.0
2007 8641 0.0 0.0 0.0
2008 8092 0.0 0.0 0.0
2009 5196 0.0 0.0 0.0
2010 5184 0.0 0.0 0.0
2011 744 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-09-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References