X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204063106032

Well Details

Well ID: 0204063106032
Loading map...
Location: 03/06-31-020-06W4/2
Location Alias: 03/06-31-20-06 W4M
Location Alias 2: 03/06-31-020-06 W4/02
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 06
Section: 31
County/Municipality: Special Areas No. 2
Well Name: CNW PANATLAS ATLEE-BUFFALO 6-31-20-6
Operator Name: Canada Northwest Energy Limited
License Number: 0134090
License Date: 1988-05-30
License Status: RecCertified
Spud Date: 1988-05-31
Final Drill Date: 1988-06-12
Well Total Depth: 1085.00 m
Surface Hole Latitude: 50.738126
Surface Hole Longitude: -110.827262

For data sources see[1][2]

Well History

Date Event
1988-05-30 Obtained License
1988-05-31 Surface Casing Operation Performed
1988-06-08 Direction Drilling Operation Performed - Deviate
1988-06-12 Finished Drilling
1988-06-12 Well Log Performed
1988-06-12 Well Mode changed to Drilled and Cased
1988-06-13 Drill Stem Test Performed
1988-06-14 Production Casing Operation Performed
1988-06-14 Rig Released
1988-07-06 Well Log Performed
1988-07-07 Perforation Treatment Performed - Jet Perforation
1988-07-07 Well Log Performed
1988-10-08 Well Began Production
1988-10-08 Well Fluid changed to Gas
1988-10-08 Well Mode changed to Flowing
1990-12-02 Well Fluid changed to Gas
1990-12-02 Well Mode changed to Suspended
1992-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-06-08 Plug Back Performed
1992-06-08 Well Abandoned
1992-06-08 Well Fluid changed to Gas
1992-06-08 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-06-08 511.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-07-07 Perforation 1019.00 1020.00 13
1992-06-08 Packing Device Capped w/Cement 1007.00 1015.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 1642 0.0 0.0 0.0
1989 3925 0.0 0.0 0.0
1990 6522 0.0 0.0 0.0

For data sources see[6]

References