X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204062308000

Well Details

Well ID: 0204062308000
Loading map...
Location: 00/08-23-020-06W4/0
Location Alias: 00/08-23-20-06 W4M
Location Alias 2: 00/08-23-020-06 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 06
Section: 23
County/Municipality: Special Areas No. 2
Well Name: RIDGEBACK ATL-BUFF 8-23-20-6
Operator Name: Ridgeback Resources Inc.
License Number: 0274316
License Date: 2002-10-02
License Status: Suspension
Spud Date: 2002-10-25
Final Drill Date: 2002-10-26
Well Total Depth: 604.40 m
Surface Hole Latitude: 50.709226
Surface Hole Longitude: -110.722805

For data sources see[1][2]

Well History

Date Event
2002-10-02 Obtained License
2002-10-07 Conductor Casing Operation Performed
2002-10-26 Finished Drilling
2002-10-26 Production Casing Operation Performed
2002-10-26 Rig Released
2002-10-26 Well Mode changed to Drilled and Cased
2002-11-02 Well Log Performed
2002-11-12 Perforation Treatment Performed - Jet Perforation
2002-11-14 Perforation Treatment Performed - Fractured
2002-11-24 Perforation Treatment Performed - Jet Perforation
2002-11-28 Perforation Treatment Performed - Fractured
2003-05-20 Well Began Production
2003-05-20 Well Fluid changed to Gas
2003-05-20 Well Mode changed to Flowing
2020-01-01 Well Fluid changed to Gas
2020-01-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-11-12 Perforation 532.50 537.50 13
2002-11-14 Fracture 532.50 537.50 0
2002-11-24 Perforation 469.00 473.00 7
2002-11-24 Perforation 461.00 463.00 7
2002-11-24 Perforation 453.00 455.00 7
2002-11-28 Fracture 469.00 473.00 0
2002-11-28 Fracture 461.00 463.00 0
2002-11-28 Fracture 453.00 455.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 4632 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8684 0.0 0.0 0.0
2006 3113 0.0 0.0 0.0
2007 2039 0.0 0.0 0.0
2008 3312 0.0 0.0 0.0
2009 4680 0.0 0.0 0.0
2010 8381 0.0 0.0 0.0
2011 6801 0.0 0.0 0.0
2012 8770 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8709 0.0 0.0 0.0
2015 8571 0.0 0.0 0.0
2016 7467 0.0 0.0 0.0
2017 5879 0.0 0.0 0.0
2018 5303 0.0 0.0 0.0
2019 2663 0.0 0.0 0.0

For data sources see[5]

References