X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204062006020

Well Details

Well ID: 0204062006020
Loading map...
Location: 02/06-20-020-06W4/0
Location Alias: 02/06-20-20-06 W4M
Location Alias 2: 02/06-20-020-06 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 06
Section: 20
County/Municipality: Special Areas No. 2
Well Name: CVE ATL-BUFF 6-20-20-6
Operator Name: Cenovus Energy Inc.
License Number: 0093684
License Date: 1981-12-03
License Status: RecCertified
Spud Date: 1981-12-29
Final Drill Date: 1982-01-14
Well Total Depth: 1070.00 m
Surface Hole Latitude: 50.709232
Surface Hole Longitude: -110.804986

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-12-03 Obtained License
1982-01-14 Finished Drilling
1982-01-14 Well Mode changed to Drilled and Cased
1982-01-20 Production Casing Operation Performed
1982-02-07 Perforation Treatment Performed - Jet Perforation
1982-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-02-18 Perforation Treatment Performed - Jet Perforation
1982-06-01 Well Began Production
1982-06-01 Well Fluid changed to Crude Oil
1982-06-01 Well Mode changed to Flowing
1984-05-25 Well Fluid changed to Crude Oil
1984-05-25 Well Mode changed to Suspended
1988-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-02-17 Perforation Treatment Performed - Jet Perforation
1988-02-17 Plug Back Performed
1988-02-17 Well Fluid changed to Crude Oil
1988-02-17 Well Log Performed
1988-02-17 Well Mode changed to Abandoned Zone
1988-05-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-05-26 Plug Back Performed
1988-05-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-02-07 Perforation 1031.50 1033.50 13
1982-02-07 Perforation 1008.00 1010.00 13
1982-02-15 Acid Treatment 1008.00 1010.00 0
1982-02-18 Perforation 1008.00 1010.00 13
1988-02-17 Packing Device Capped w/Cement 985.00 993.00 0
1988-02-17 Perforation 815.00 816.00 13
1988-05-26 Packing Device Capped w/Cement 804.00 812.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 2634 0.0 0.0 0.0

For data sources see[5]

References