X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0195032513000

Well Details

Well ID: 0195032513000
Loading map...
Location: 00/13-25-019-03W5/0
Location Alias: 00/13-25-19-03 W5M
Location Alias 2: 00/13-25-019-03 W5/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 03
Section: 25
County/Municipality: Foothills County
Well Name: CPEC ANGLO CDN. 12 TV 13-25-19-3
Operator Name: Crescent Point Energy Corp.
License Number: B0000521
License Date: 1943-10-27
License Status: Issued
Spud Date: 1943-11-15
Final Drill Date: 1944-03-28
Well Total Depth: 2270.50 m
Surface Hole Latitude: 50.642957
Surface Hole Longitude: -114.298949

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1943-10-27 Obtained License
1944-03-28 Finished Drilling
1944-03-28 Perforation Treatment Performed - Open-Hole Completion
1944-03-28 Production Casing Operation Performed
1944-03-28 Well Mode changed to Drilled and Cased
1944-03-29 Well Began Production
1944-03-29 Well Fluid changed to Crude Oil
1944-03-29 Well Mode changed to Flowing
1944-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1944-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1944-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1944-04-17 Perforation Treatment Performed - Acid Wash - No Pressure
1944-05-01 Perforation Treatment Performed - Acid Wash - No Pressure
1944-05-06 Perforation Treatment Performed - Acid Wash - No Pressure
1944-05-13 Perforation Treatment Performed - Acid Wash - No Pressure
2003-07-08 Well Fluid changed to Crude Oil
2003-07-08 Well Mode changed to Pumping
2014-01-28 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1944-03-28 Open Hole/Barefoot Completion 2204.00 2270.50 0
1944-03-30 Acid Treatment 2238.80 2267.70 0
1944-03-31 Acid Treatment 2238.80 2267.70 0
1944-04-06 Acid Treatment 2238.80 2267.70 0
1944-04-17 Acid Wash 2238.80 2267.70 0
1944-05-01 Acid Wash 2238.80 2267.70 0
1944-05-06 Acid Wash 2238.80 2267.70 0
1944-05-13 Acid Wash 2238.80 2267.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 24 0.0 0.0 0.0
1971 96 0.0 0.0 0.0
1972 191 0.0 0.0 0.0
1973 400 0.0 0.0 0.0
1974 473 0.0 0.0 0.0
1976 321 0.0 0.0 0.0
1977 406 0.0 0.0 0.0
1979 744 0.0 0.0 0.0
1981 668 0.0 0.0 0.0
1982 6547 0.0 0.0 0.0
1983 7896 0.0 0.0 0.0
1984 6723 0.0 0.0 0.0
1985 6274 0.0 0.0 0.0
1986 4121 0.0 0.0 0.0
1987 7942 0.0 0.0 0.0
1988 8481 0.0 0.0 0.0
1989 8298 0.0 0.0 0.0
1990 8284 0.0 0.0 0.0
1991 8231 0.0 0.0 0.0
1992 8561 0.0 0.0 0.0
1993 8108 0.0 0.0 0.0
1994 8595 0.0 0.0 0.0
1995 7938 0.0 0.0 0.0
1996 8578 0.0 0.0 0.0
1997 8755 0.0 0.0 0.0
1998 8472 0.0 0.0 0.0
1999 8682 0.0 0.0 0.0
2000 8456 0.0 0.0 0.0
2001 7850 0.0 0.0 0.0
2002 8468 0.0 0.0 0.0
2003 8490 0.0 0.0 0.0
2004 8046 0.0 0.0 0.0
2005 6477 0.0 0.0 0.0
2006 8647 0.0 0.0 0.0
2007 8047 0.0 0.0 0.0
2008 8757 0.0 0.0 0.0
2009 8714 0.0 0.0 0.0
2010 8441 0.0 0.0 0.0
2011 8473 0.0 0.0 0.0
2012 8735 0.0 0.0 0.0
2013 8718 0.0 0.0 0.0
2014 8398 0.0 0.0 0.0
2015 8627 0.0 0.0 0.0
2016 8538 0.0 0.0 0.0
2017 8694 0.0 0.0 0.0
2018 8494 0.0 0.0 0.0
2019 8753 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References