X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0195032406000

Well Details

Well ID: 0195032406000
Loading map...
Location: 00/06-24-019-03W5/0
Location Alias: 00/06-24-19-03 W5M
Location Alias 2: 00/06-24-019-03 W5/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 03
Section: 24
County/Municipality: Foothills County
Well Name: CPEC CHINOOK 1 TV 6-24-19-3
Operator Name: Crescent Point Energy Corp.
License Number: B0000454
License Date: 1943-06-28
License Status: Issued
Spud Date: 1943-09-01
Final Drill Date: 1944-03-29
Well Total Depth: 2574.00 m
Surface Hole Latitude: 50.621069
Surface Hole Longitude: -114.293250

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1943-06-28 Obtained License
1944-03-16 Production Casing Operation Performed
1944-03-29 Finished Drilling
1944-03-29 Perforation Treatment Performed - Open-Hole Completion
1944-03-29 Well Mode changed to Drilled and Cased
1944-03-30 Well Began Production
1944-03-30 Well Fluid changed to Crude Oil
1944-03-30 Well Mode changed to Flowing
1944-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1944-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1944-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1944-04-13 Perforation Treatment Performed - Acid Wash - No Pressure
1944-04-17 Perforation Treatment Performed - Acid Wash - No Pressure
1944-04-21 Perforation Treatment Performed - Acid Wash - No Pressure
1961-06-06 Well Began Injection
1961-06-06 Well Fluid changed to Water
1961-06-06 Well Type changed to Injection
1961-07-05 Perforation Treatment Performed - Acid Wash - No Pressure
1961-07-06 Perforation Treatment Performed - Acid Wash - No Pressure
1961-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-03 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1944-03-29 Open Hole/Barefoot Completion 2503.00 2574.00 0
1961-07-07 Acid Treatment 2537.50 2567.90 0
1970-10-21 Acid Treatment 2542.00 2567.90 0
1944-04-07 Acid Treatment 2537.50 2567.90 0
1944-04-10 Acid Treatment 2537.50 2567.90 0
1944-04-11 Acid Treatment 2537.50 2567.90 0
1944-04-13 Acid Wash 2537.50 2567.90 0
1944-04-17 Acid Wash 2537.50 2567.90 0
1944-04-21 Acid Wash 2537.50 2567.90 0
1961-07-05 Acid Wash 2537.50 2567.90 0
1961-07-06 Acid Wash 2537.50 2567.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References