X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0195032402000

Well Details

Well ID: 0195032402000
Loading map...
Location: 00/02-24-019-03W5/0
Location Alias: 00/02-24-19-03 W5M
Location Alias 2: 00/02-24-019-03 W5/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 03
Section: 24
County/Municipality: Foothills County
Well Name: CPEC BRIT. AB BROWN 2 TV 2-24-19-3
Operator Name: Crescent Point Energy Corp.
License Number: B0000162
License Date: 1940-11-20
License Status: Issued
Spud Date: 1940-12-12
Final Drill Date: 1941-06-14
Well Total Depth: 2558.80 m
Surface Hole Latitude: 50.617654
Surface Hole Longitude: -114.287060

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1940-11-20 Obtained License
1941-05-24 Production Casing Operation Performed
1941-06-14 Finished Drilling
1941-06-14 Perforation Treatment Performed - Open-Hole Completion
1941-06-14 Well Mode changed to Drilled and Cased
1941-06-15 Well Began Production
1941-06-15 Well Fluid changed to Crude Oil
1941-06-15 Well Mode changed to Flowing
1941-06-16 Perforation Treatment Performed - Acid Wash - No Pressure
1941-06-18 Perforation Treatment Performed - Acid Wash - No Pressure
1941-06-20 Perforation Treatment Performed - Acid Wash - No Pressure
1941-06-21 Perforation Treatment Performed - Acid Wash - No Pressure
1941-06-23 Perforation Treatment Performed - Acid Wash - No Pressure
1941-06-30 Perforation Treatment Performed - Acid Wash - No Pressure
1941-07-01 Perforation Treatment Performed - Acid Wash - No Pressure
1963-04-20 Well Fluid changed to Crude Oil
1963-04-20 Well Mode changed to Pumping
1964-02-10 Well Fluid changed to Crude Oil
1964-02-10 Well Mode changed to Gas Lift
1971-01-06 Well Fluid changed to Crude Oil
1971-01-06 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1941-06-14 Open Hole/Barefoot Completion 2498.80 2558.80 0
1941-06-16 Acid Wash 2548.10 2551.20 0
1941-06-18 Acid Wash 2548.10 2551.20 0
1941-06-20 Acid Wash 2548.10 2551.20 0
1941-06-21 Acid Wash 2548.10 2551.20 0
1941-06-23 Acid Wash 2456.70 2484.10 0
1941-06-30 Acid Wash 2456.70 2484.10 0
1941-07-01 Acid Wash 2456.70 2484.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 672 0.0 0.0 0.0
1968 7327 0.0 0.0 0.0
1969 8278 0.0 0.0 0.0
1970 8414 0.0 0.0 0.0
1971 8267 0.0 0.0 0.0
1972 8423 0.0 0.0 0.0
1973 8319 0.0 0.0 0.0
1974 8264 0.0 0.0 0.0
1975 8507 0.0 0.0 0.0
1976 8567 0.0 0.0 0.0
1977 8376 0.0 0.0 0.0
1978 8382 0.0 0.0 0.0
1979 8436 0.0 0.0 0.0
1980 7615 0.0 0.0 0.0
1981 8150 0.0 0.0 0.0
1982 6535 0.0 0.0 0.0
1983 8177 0.0 0.0 0.0
1984 8488 0.0 0.0 0.0
1985 8039 0.0 0.0 0.0
1986 8346 0.0 0.0 0.0
1987 8050 0.0 0.0 0.0
1988 8483 0.0 0.0 0.0
1989 8304 0.0 0.0 0.0
1990 8435 0.0 0.0 0.0
1991 8444 0.0 0.0 0.0
1992 8644 0.0 0.0 0.0
1993 7912 0.0 0.0 0.0
1994 8534 0.0 0.0 0.0
1995 8045 0.0 0.0 0.0
1996 8519 0.0 0.0 0.0
1997 8516 0.0 0.0 0.0
1998 8635 0.0 0.0 0.0
1999 8660 0.0 0.0 0.0
2000 8563 0.0 0.0 0.0
2001 7961 0.0 0.0 0.0
2002 8593 0.0 0.0 0.0
2003 8525 0.0 0.0 0.0
2004 8301 0.0 0.0 0.0
2005 7195 0.0 0.0 0.0
2006 8580 0.0 0.0 0.0
2007 8265 0.0 0.0 0.0
2008 8683 0.0 0.0 0.0
2009 8597 0.0 0.0 0.0
2010 8156 0.0 0.0 0.0
2011 8528 0.0 0.0 0.0
2012 8670 0.0 0.0 0.0
2013 8668 0.0 0.0 0.0
2014 8690 0.0 0.0 0.0
2015 8742 0.0 0.0 0.0
2016 8347 0.0 0.0 0.0
2017 8743 0.0 0.0 0.0
2018 8751 0.0 0.0 0.0
2019 8744 0.0 0.0 0.0
2020 1848 0.0 0.0 0.0

For data sources see[5]

References