X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0195031008000

Well Details

Well ID: 0195031008000
Loading map...
Location: 00/08-10-019-03W5/0
Location Alias: 00/08-10-19-03 W5M
Location Alias 2: 00/08-10-019-03 W5/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 03
Section: 10
County/Municipality: Foothills County
Well Name: WASCANA ET AL TV 8-10-19-3
Operator Name: CNOOC Petroleum North America ULC
License Number: 0148906
License Date: 1991-05-17
License Status: RecCertified
Spud Date: 1991-06-01
Final Drill Date: 1991-06-16
Well Total Depth: 1082.00 m
Surface Hole Latitude: 50.591430
Surface Hole Longitude: -114.330731

For data sources see[1][2]

Well History

Date Event
1991-05-17 Obtained License
1991-06-03 Surface Casing Operation Performed
1991-06-16 Finished Drilling
1991-06-17 Well Log Performed
1991-06-18 Well Log Performed
1991-06-19 Well Log Performed
1991-06-21 Production Casing Operation Performed
1991-06-22 Rig Released
1991-10-09 Well Log Performed
1991-10-10 Well Log Performed
1991-10-11 Perforation Treatment Performed - Abrasa-Jet Perforation
1991-10-14 Perforation Treatment Performed - Abrasa-Jet Perforation
1991-10-15 Perforation Treatment Performed - Abrasa-Jet Perforation
1991-10-16 Perforation Treatment Performed - Abrasa-Jet Perforation
1993-08-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-03 Plug Back Performed
1993-08-04 Well Mode changed to Abandoned
1993-09-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-10-11 Hydra Jet Perforation 904.70 906.20 0
1991-10-16 Hydra Jet Perforation 920.40 921.40 0
1991-10-16 Hydra Jet Perforation 922.00 923.00 0
1993-08-03 Packing Device Capped w/Cement 890.00 898.00 0
1991-10-11 Hydra Jet Perforation 906.80 907.70 0
1991-10-11 Hydra Jet Perforation 908.10 909.00 0
1991-10-14 Hydra Jet Perforation 909.50 910.60 0
1991-10-14 Hydra Jet Perforation 911.20 912.30 0
1991-10-14 Hydra Jet Perforation 912.80 913.90 0
1991-10-14 Hydra Jet Perforation 914.40 915.40 0
1991-10-15 Hydra Jet Perforation 916.50 917.00 0
1991-10-15 Hydra Jet Perforation 917.80 918.70 0

For data sources see[4]



References