X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0195023102002

Well Details

Well ID: 0195023102002
Loading map...
Location: 00/02-31-019-02W5/2
Location Alias: 00/02-31-19-02 W5M
Location Alias 2: 00/02-31-019-02 W5/02
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 02
Section: 31
County/Municipality: Foothills County
Well Name: CPEC TV 2-31-19-2
Operator Name: Crescent Point Energy Corp.
License Number: 0084249
License Date: 1980-07-17
License Status: Amended
Spud Date: 1980-07-18
Final Drill Date: 1980-08-18
Well Total Depth: 1655.00 m
Surface Hole Latitude: 50.647199
Surface Hole Longitude: -114.259976

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-07-17 Obtained License
1980-07-18 Lost Circulation Occurred
1980-07-31 Well Log Performed
1980-08-18 Finished Drilling
1980-08-18 Well Mode changed to Drilled and Cased
1980-08-28 Well Log Performed
1980-08-29 Production Casing Operation Performed
1980-09-26 Perforation Treatment Performed - Jet Perforation
1980-09-27 Perforation Treatment Performed - Acid Wash - No Pressure
1980-09-29 Perforation Treatment Performed - Fractured
1980-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-10-05 Perforation Treatment Performed - Jet Perforation
1980-10-06 Perforation Treatment Performed - Fractured
1983-09-09 Well Log Performed
1983-09-13 Perforation Treatment Performed - Jet Perforation
1983-09-15 Perforation Treatment Performed - Cement Squeeze
1983-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-09-20 Perforation Treatment Performed - Jet Perforation
1983-09-21 Perforation Treatment Performed - Cement Squeeze
1983-09-23 Well Log Performed
1983-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-09-26 Perforation Treatment Performed - Jet Perforation
1983-09-27 Perforation Treatment Performed - Jet Perforation
1983-09-28 Perforation Treatment Performed - Cement Squeeze
1983-10-01 Well Log Performed
1983-10-02 Perforation Treatment Performed - Jet Perforation
1983-10-07 Perforation Treatment Performed - Fractured
2003-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-06 Plug Back Performed
2003-06-06 Well Log Performed
2003-06-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-07 Plug Back Performed
2003-06-07 Well Log Performed
2003-06-13 Perforation Treatment Performed - Jet Perforation
2003-06-13 Well Log Performed
2003-06-19 Perforation Treatment Performed - Fractured
2003-07-14 Well Began Production
2003-07-14 Well Fluid changed to Gas
2003-07-14 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-09-26 Perforation 1597.00 1598.00 13
1983-09-13 Perforation 1207.00 1208.00 13
1983-09-15 Cement Squeeze 1207.00 1208.00 0
1983-09-20 Perforation 1212.00 1213.00 13
1983-09-20 Perforation 1233.00 1234.00 13
1983-09-20 Acid Treatment 1212.00 1234.00 0
1983-09-21 Cement Squeeze 1212.00 1234.00 0
1983-09-26 Perforation 1231.00 1232.00 13
1983-09-26 Perforation 1252.00 1253.00 13
1983-09-26 Acid Treatment 1231.00 1253.00 0
1983-09-27 Perforation 1240.00 1241.00 13
1980-09-26 Perforation 1599.50 1601.50 13
1983-09-28 Cement Squeeze 1231.00 1253.00 0
1983-10-02 Perforation 1219.50 1223.50 13
1983-10-07 Fracture 1219.50 1223.50 0
2003-06-06 Packing Device Capped w/Cement 1342.00 1350.00 0
2003-06-07 Packing Device Capped w/Cement 1196.50 1204.50 0
2003-06-13 Perforation 1090.50 1095.00 20
2003-06-13 Perforation 867.00 871.00 20
2003-06-19 Fracture 1090.50 1095.00 0
2003-06-19 Fracture 867.00 871.00 0
1980-09-27 Acid Wash 1597.00 1601.50 0
1980-09-29 Fracture 1597.00 1601.50 0
1980-10-04 Packing Device Capped w/Cement 1572.00 1580.00 0
1980-10-05 Perforation 1361.50 1363.50 13
1980-10-05 Acid Treatment 1361.50 1363.50 0
1980-10-06 Fracture 1361.50 1363.50 0
1983-09-13 Perforation 1240.00 1241.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 4008 0.0 0.0 0.0
2004 5877 0.0 0.0 0.0
2005 6946 0.0 0.0 0.0
2006 8253 0.0 0.0 0.0
2007 4652 0.0 0.0 0.0
2008 4584 0.0 0.0 0.0
2009 7460 0.0 0.0 0.0
2010 8189 0.0 0.0 0.0
2011 7856 0.0 0.0 0.0
2012 8513 0.0 0.0 0.0
2013 7338 0.0 0.0 0.0
2014 6768 0.0 0.0 0.0
2015 8604 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 7937 0.0 0.0 0.0
2018 7992 0.0 0.0 0.0
2019 7643 0.0 0.0 0.0
2020 1874 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-07-18 Lost Circulation 15.00 15.00

For data sources see[6]

References