X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0195023016020

Well Details

Well ID: 0195023016020
Loading map...
Location: 02/16-30-019-02W5/0
Location Alias: 02/16-30-19-02 W5M
Location Alias 2: 02/16-30-019-02 W5/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 02
Section: 30
County/Municipality: Foothills County
Well Name: CPEC 102 TV 16-30-19-2
Operator Name: Crescent Point Energy Corp.
License Number: 0054930
License Date: 1975-09-15
License Status: Issued
Spud Date: 1975-09-26
Final Drill Date: 1975-10-15
Well Total Depth: 1496.00 m
Surface Hole Latitude: 50.640648
Surface Hole Longitude: -114.262561

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-09-15 Obtained License
1975-10-15 Finished Drilling
1975-10-17 Drill Stem Test Performed
1975-10-18 Drill Stem Test Performed
1975-10-20 Production Casing Operation Performed
1975-12-10 Perforation Treatment Performed - Jet Perforation
1975-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-12-16 Perforation Treatment Performed - Fractured
1976-01-08 Perforation Treatment Performed - Jet Perforation
1976-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-11 Perforation Treatment Performed - Fractured
1976-01-29 Well Mode changed to Drilled and Cased
1976-07-12 Well Began Production
1976-07-12 Well Fluid changed to Gas
1976-07-12 Well Mode changed to Flowing
1984-06-01 Well Fluid changed to Gas
1984-06-01 Well Mode changed to Flowing
1986-02-01 Well Fluid changed to Gas
1986-02-01 Well Mode changed to Suspended
1993-01-08 Well Fluid changed to Gas
1993-01-08 Well Mode changed to Flowing
2001-01-01 Well Fluid changed to Gas
2001-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-12-10 Perforation 1419.10 1422.20 7
1975-12-10 Perforation 1424.60 1431.00 7
1975-12-12 Acid Treatment 1419.10 1431.00 0
1975-12-16 Fracture 1419.10 1431.00 0
1976-01-08 Perforation 1270.70 1273.50 13
1976-01-09 Acid Treatment 1270.70 1273.50 0
1976-01-11 Fracture 1270.70 1273.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 50 0.0 0.0 0.0
1976 1966 0.0 0.0 0.0
1977 7655 0.0 0.0 0.0
1978 6263 0.0 0.0 0.0
1979 6551 0.0 0.0 0.0
1980 6359 0.0 0.0 0.0
1981 7560 0.0 0.0 0.0
1982 8001 0.0 0.0 0.0
1983 7294 0.0 0.0 0.0
1984 6377 0.0 0.0 0.0
1985 3127 0.0 0.0 0.0
1993 8203 0.0 0.0 0.0
1994 8473 0.0 0.0 0.0
1995 8422 0.0 0.0 0.0
1996 8645 0.0 0.0 0.0
1997 8717 0.0 0.0 0.0
1998 8322 0.0 0.0 0.0
1999 8562 0.0 0.0 0.0
2000 8782 0.0 0.0 0.0
2001 8016 0.0 0.0 0.0
2002 8297 0.0 0.0 0.0
2003 8564 0.0 0.0 0.0
2004 8265 0.0 0.0 0.0
2005 7090 0.0 0.0 0.0
2006 8420 0.0 0.0 0.0
2007 4867 0.0 0.0 0.0
2008 4635 0.0 0.0 0.0
2009 7513 0.0 0.0 0.0
2010 8161 0.0 0.0 0.0
2011 7863 0.0 0.0 0.0
2012 8543 0.0 0.0 0.0
2013 7416 0.0 0.0 0.0
2014 6797 0.0 0.0 0.0
2015 8641 0.0 0.0 0.0
2016 8782 0.0 0.0 0.0
2017 7961 0.0 0.0 0.0
2018 7992 0.0 0.0 0.0
2019 7979 0.0 0.0 0.0
2020 1874 0.0 0.0 0.0

For data sources see[5]

References