0195021805003

Well Details

Well ID: 0195021805003
Loading map...
Location: 00/05-18-019-02W5/3
Location Alias: 00/05-18-19-02 W5M
Location Alias 2: 00/05-18-019-02 W5/03
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 02
Section: 18
County/Municipality: Foothills County
Well Name: CPEC CALMONT NW 2 TV 5-18-19-2
Operator Name: Crescent Point Energy Corp.
License Number: B0000111
License Date: 1940-05-21
License Status: Abandoned
Spud Date: 1940-06-08
Final Drill Date: 1940-10-31
Well Total Depth: 2425.00 m
Surface Hole Latitude: 50.606591
Surface Hole Longitude: -114.275871

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1940-05-21 Obtained License
1940-10-17 Production Casing Operation Performed
1940-10-31 Finished Drilling
1940-10-31 Perforation Treatment Performed - Open-Hole Completion
1940-10-31 Well Mode changed to Drilled and Cased
1940-11-02 Perforation Treatment Performed - Acid Wash - No Pressure
1940-11-04 Perforation Treatment Performed - Acid Wash - No Pressure
2010-08-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-24 Perforation Treatment Performed - Jet Perforation
2010-08-24 Plug Back Performed
2010-08-25 Perforation Treatment Performed - Jet Perforation
2010-08-25 Perforation Treatment Performed - Remedial Casing
2010-08-26 Perforation Treatment Performed - Remedial Casing
2010-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-28 Perforation Treatment Performed - Jet Perforation
2010-08-28 Plug Back Performed
2010-08-28 Well Mode changed to Abandoned Zone
2010-08-29 Perforation Treatment Performed - Remedial Casing
2010-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-30 Perforation Treatment Performed - Jet Perforation
2010-08-30 Plug Back Performed
2010-08-31 Perforation Treatment Performed - Remedial Casing
2010-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-09-01 Perforation Treatment Performed - Jet Perforation
2010-09-01 Plug Back Performed
2010-09-02 Perforation Treatment Performed - Cement Squeeze
2010-09-02 Plug Back Performed
2010-11-17 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1940-10-31 Open Hole/Barefoot Completion 2287.20 2425.00 0
2010-08-28 Perforation 600.00 601.00 20
2010-08-29 Remedial Casing Cementing 600.00 601.00 0
2010-08-30 Packing Device Capped w/Cement 586.00 594.00 0
2010-08-30 Perforation 459.00 460.00 20
2010-08-31 Remedial Casing Cementing 459.00 460.00 0
2010-09-01 Packing Device Capped w/Cement 447.00 455.00 0
2010-09-01 Perforation 373.00 374.00 20
2010-09-02 Cement Squeeze 373.00 374.00 0
1940-11-02 Acid Wash 2287.20 2425.00 0
1940-11-04 Acid Wash 2287.20 2425.00 0
2010-08-24 Packing Device Capped w/Cement 2272.00 2280.00 0
2010-08-24 Perforation 1760.00 1761.00 20
2010-08-25 Remedial Casing Cementing 1760.00 1761.00 0
2010-08-25 Perforation 1604.00 1605.00 20
2010-08-26 Remedial Casing Cementing 1604.00 1605.00 0
2010-08-28 Packing Device Capped w/Cement 672.00 680.00 0

For data sources see[4]