If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0195021804S03 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.595476,"lon":-114.269022,"icon":""}]} |
Location: S0/04-18-019-02W5/3 | |
Location Alias: S0/04-18-19-02 W5M | |
Location Alias 2: S0/04-18-019-02 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 019 | |
Meridian: 5 | |
Range: 02 | |
Section: 18 | |
County/Municipality: Foothills County | |
Well Name: CPEC 102 HARTELL #6 TV 11-7-19-2 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0433883 | |
License Date: 2011-05-30 | |
License Status: Amended | |
Spud Date: 2011-08-05 | |
Final Drill Date: 2011-10-05 | |
Well Total Depth: 3156.00 m | |
Surface Hole Latitude: 50.595476 | |
Surface Hole Longitude: -114.269022 |
Date | Event |
---|---|
2011-05-30 | Obtained License |
2011-09-23 | Intermediate Casing Operation Performed |
2011-09-26 | Direction Drilling Operation Performed - Horizontal |
2011-10-05 | Finished Drilling |
2011-10-05 | Well Mode changed to Drilled and Cased |
2011-10-07 | Well Log Performed |
2011-10-09 | Liner Casing Operation Performed |
2011-10-10 | Rig Released |
2011-11-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-11-23 | Well Began Production |
2011-11-23 | Well Fluid changed to Crude Oil |
2011-11-23 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-26 | 2415.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-11-04 | Multi-Stage Fracture | 3121.90 | 3122.80 | 0 |
2011-11-12 | Multi-Stage Fracture | 2320.40 | 2320.90 | 0 |
2011-11-04 | Multi-Stage Fracture | 3045.30 | 3045.80 | 0 |
2011-11-11 | Multi-Stage Fracture | 2497.00 | 2497.50 | 0 |
2011-11-11 | Multi-Stage Fracture | 2857.00 | 2857.50 | 0 |
2011-11-12 | Multi-Stage Fracture | 2767.00 | 2767.50 | 0 |
2011-11-12 | Multi-Stage Fracture | 2677.00 | 2677.50 | 0 |
2011-11-12 | Multi-Stage Fracture | 2587.00 | 2587.50 | 0 |
2011-11-12 | Multi-Stage Fracture | 2496.00 | 2496.50 | 0 |
2011-11-12 | Multi-Stage Fracture | 2406.00 | 2406.50 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 676 | 0.0 | 0.0 | 0.0 |
2012 | 8428 | 0.0 | 0.0 | 0.0 |
2013 | 8454 | 0.0 | 0.0 | 0.0 |
2014 | 8489 | 0.0 | 0.0 | 0.0 |
2015 | 8493 | 0.0 | 0.0 | 0.0 |
2016 | 8188 | 0.0 | 0.0 | 0.0 |
2017 | 8729 | 0.0 | 0.0 | 0.0 |
2018 | 8466 | 0.0 | 0.0 | 0.0 |
2019 | 8734 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]