X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0195021803000

Well Details

Well ID: 0195021803000
Loading map...
Location: 00/03-18-019-02W5/0
Location Alias: 00/03-18-19-02 W5M
Location Alias 2: 00/03-18-019-02 W5/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 02
Section: 18
County/Municipality: Foothills County
Well Name: CPEC CALMONT NW 1 TV 3-18-19-2
Operator Name: Crescent Point Energy Corp.
License Number: B0000085
License Date: 1939-11-15
License Status: Suspension
Spud Date: 1939-12-09
Final Drill Date: 1940-04-23
Well Total Depth: 2319.20 m
Surface Hole Latitude: 50.602972
Surface Hole Longitude: -114.270189

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1939-11-15 Obtained License
1940-04-07 Production Casing Operation Performed
1940-04-23 Finished Drilling
1940-04-23 Perforation Treatment Performed - Open-Hole Completion
1940-04-23 Well Mode changed to Drilled and Cased
1940-04-24 Well Began Production
1940-04-24 Well Fluid changed to Crude Oil
1940-04-24 Well Mode changed to Flowing
1940-04-26 Perforation Treatment Performed - Acid Wash - No Pressure
1940-04-27 Perforation Treatment Performed - Acid Wash - No Pressure
1940-04-29 Perforation Treatment Performed - Acid Wash - No Pressure
1940-05-10 Perforation Treatment Performed - Acid Wash - No Pressure
1940-05-11 Perforation Treatment Performed - Acid Wash - No Pressure
1940-05-16 Perforation Treatment Performed - Acid Wash - No Pressure
1940-05-19 Perforation Treatment Performed - Acid Wash - No Pressure
1940-05-21 Perforation Treatment Performed - Acid Wash - No Pressure
1940-05-24 Perforation Treatment Performed - Acid Wash - No Pressure
1999-10-12 Well Fluid changed to Crude Oil
1999-10-12 Well Mode changed to Pumping
2019-01-01 Well Fluid changed to Crude Oil
2019-01-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1940-04-23 Open Hole/Barefoot Completion 2191.20 2319.20 0
1940-05-24 Acid Wash 2218.90 2249.40 0
1940-04-26 Acid Wash 2218.90 2307.30 0
1940-04-27 Acid Wash 2218.90 2249.40 0
1940-04-29 Acid Wash 2298.20 2307.30 0
1940-05-10 Acid Wash 2298.20 2307.30 0
1940-05-11 Acid Wash 2298.20 2307.30 0
1940-05-16 Acid Wash 2298.20 2307.30 0
1940-05-19 Acid Wash 2218.90 2307.30 0
1940-05-21 Acid Wash 2218.90 2249.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 6469 0.0 0.0 0.0
1972 8039 0.0 0.0 0.0
1973 8759 0.0 0.0 0.0
1974 7382 0.0 0.0 0.0
1975 8253 0.0 0.0 0.0
1976 7512 0.0 0.0 0.0
1977 7769 0.0 0.0 0.0
1978 5056 0.0 0.0 0.0
1979 8585 0.0 0.0 0.0
1980 8719 0.0 0.0 0.0
1981 8577 0.0 0.0 0.0
1982 5709 0.0 0.0 0.0
1983 6593 0.0 0.0 0.0
1984 7340 0.0 0.0 0.0
1985 6408 0.0 0.0 0.0
1986 5268 0.0 0.0 0.0
1987 8004 0.0 0.0 0.0
1988 8527 0.0 0.0 0.0
1989 8506 0.0 0.0 0.0
1990 8380 0.0 0.0 0.0
1991 8687 0.0 0.0 0.0
1992 8647 0.0 0.0 0.0
1993 8335 0.0 0.0 0.0
1994 8492 0.0 0.0 0.0
1995 8668 0.0 0.0 0.0
1996 8703 0.0 0.0 0.0
1997 8745 0.0 0.0 0.0
1998 7871 0.0 0.0 0.0
1999 7171 0.0 0.0 0.0
2000 8591 0.0 0.0 0.0
2001 8140 0.0 0.0 0.0
2002 8746 0.0 0.0 0.0
2003 8557 0.0 0.0 0.0
2004 8480 0.0 0.0 0.0
2005 7196 0.0 0.0 0.0
2006 8633 0.0 0.0 0.0
2007 8235 0.0 0.0 0.0
2008 8671 0.0 0.0 0.0
2009 8300 0.0 0.0 0.0
2010 8246 0.0 0.0 0.0
2011 8365 0.0 0.0 0.0
2012 8694 0.0 0.0 0.0
2013 8372 0.0 0.0 0.0
2014 8653 0.0 0.0 0.0
2015 8739 0.0 0.0 0.0
2016 1152 0.0 0.0 0.0

For data sources see[5]

References