X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0195020911008

Well Details

Well ID: 0195020911008
Loading map...
Location: 00/11-09-019-02W5/8
Location Alias: 00/11-09-19-02 W5M
Location Alias 2: 00/11-09-019-02 W5/08
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 02
Section: 09
County/Municipality: Foothills County
Well Name: CPEC TV 11-9-19-2
Operator Name: Crescent Point Energy Corp.
License Number: 0162045
License Date: 1993-11-04
License Status: Amended
Spud Date: 1993-11-28
Final Drill Date: 1994-11-28
Well Total Depth: 3202.00 m
Surface Hole Latitude: 50.594277
Surface Hole Longitude: -114.224719

For data sources see[1][2]

Well History

Date Event
1993-11-04 Obtained License
1994-09-26 Direction Drilling Operation Performed - Deviate
1994-11-28 Finished Drilling
1994-11-28 Perforation Treatment Performed - Open-Hole Completion
1994-11-28 Well Mode changed to Drilled and Cased
1994-11-30 Rig Released
1994-12-03 Perforation Treatment Performed - Cement Squeeze
1994-12-03 Plug Back Performed
1994-12-04 Perforation Treatment Performed - Jet Perforation
1994-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-06 Perforation Treatment Performed - Jet Perforation
1994-12-06 Well Log Performed
1994-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-08 Perforation Treatment Performed - Jet Perforation
1994-12-09 Well Log Performed
1994-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-13 Perforation Treatment Performed - Fractured
1994-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-12-18 Plug Back Performed
1994-12-19 Perforation Treatment Performed - Jet Perforation
1994-12-19 Well Log Performed
1994-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-01-11 Well Log Performed
1995-01-13 Well Log Performed
1995-01-18 Well Log Performed
1997-06-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-06-12 Perforation Treatment Performed - Jet Perforation
1997-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-06-15 Perforation Treatment Performed - Fractured
2001-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-09 Plug Back Performed
2001-03-10 Perforation Treatment Performed - Jet Perforation
2001-05-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-18 Perforation Treatment Performed - Jet Perforation
2001-05-18 Plug Back Performed
2001-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-21 Perforation Treatment Performed - Remedial Casing
2001-05-22 Perforation Treatment Performed - Remedial Casing
2001-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-25 Perforation Treatment Performed - Jet Perforation
2001-05-27 Perforation Treatment Performed - Fractured
2001-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-06 Perforation Treatment Performed - Jet Perforation
2001-06-06 Plug Back Performed
2001-06-09 Perforation Treatment Performed - Fractured
2001-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-11 Plug Back Performed
2001-06-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-13 Perforation Treatment Performed - Jet Perforation
2001-06-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-06-15 Perforation Treatment Performed - Jet Perforation
2001-06-15 Plug Back Performed
2001-06-15 Well Mode changed to Drilled and Cased
2001-06-19 Perforation Treatment Performed - Fractured
2001-10-10 Well Began Production
2001-10-10 Well Fluid changed to Gas
2001-10-10 Well Mode changed to Flowing
2010-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-06-10 Plug Back Performed
2010-06-13 Perforation Treatment Performed - Jet Perforation
2010-06-14 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-09-26 2633.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-11-28 Open Hole/Barefoot Completion 3186.50 3202.00 0
1994-12-18 Packing Device Capped w/Cement 3130.00 3138.00 0
1994-12-19 Perforation 3046.00 3055.00 13
1994-12-19 Perforation 3061.00 3064.00 13
1994-12-19 Perforation 3070.00 3073.00 13
1994-12-19 Perforation 3076.00 3080.00 13
1994-12-20 Acid Treatment 3046.00 3080.00 0
1997-06-08 Packing Device Capped w/Cement 1687.00 1695.00 0
1997-06-09 Packing Device Capped w/Cement 1492.00 1500.00 0
1997-06-12 Perforation 1374.00 1375.50 18
1997-06-12 Perforation 1378.00 1379.00 18
1994-12-03 Cement Squeeze 3186.50 3202.00 0
1997-06-12 Perforation 1384.50 1393.00 18
1997-06-14 Acid Treatment 1374.00 1393.00 0
1997-06-15 Fracture 1374.00 1393.00 0
2001-03-09 Packing Device Capped w/Cement 1353.00 1361.00 0
2001-03-10 Perforation 1310.00 1324.00 17
2001-03-10 Perforation 1292.00 1298.00 17
2001-03-10 Perforation 1283.00 1287.00 17
2001-05-18 Packing Device Capped w/Cement 1265.00 1273.00 0
2001-05-18 Perforation 1047.00 1048.00 17
2001-05-18 Perforation 1121.00 1122.00 17
1994-12-04 Perforation 3176.00 3180.00 13
2001-05-20 Acid Treatment 1047.00 1048.00 0
2001-05-20 Acid Treatment 1121.00 1122.00 0
2001-05-21 Remedial Casing Cementing 1121.00 1122.00 0
2001-05-22 Remedial Casing Cementing 1047.00 1048.00 0
2001-05-25 Packing Device Capped w/Cement 1110.00 1118.00 0
2001-05-25 Perforation 1096.00 1099.00 17
2001-05-27 Fracture 1096.00 1099.00 0
2001-06-03 Packing Device Capped w/Cement 1110.00 1118.00 0
2001-06-06 Packing Device Capped w/Cement 1085.00 1093.00 0
2001-06-06 Perforation 1068.00 1072.00 17
1994-12-06 Acid Treatment 3176.00 3180.00 0
2001-06-09 Fracture 1068.00 1072.00 0
2001-06-11 Packing Device Capped w/Cement 1052.80 1060.80 0
2001-06-12 Packing Device Capped w/Cement 1029.00 1037.00 0
2001-06-13 Perforation 908.00 912.00 17
2001-06-15 Packing Device Capped w/Cement 895.70 903.70 0
2001-06-15 Perforation 780.00 790.00 17
2001-06-19 Fracture 780.00 790.00 0
2010-06-10 Packing Device Capped w/Cement 888.00 896.00 0
2010-06-13 Perforation 825.00 826.00 9
2010-06-13 Perforation 816.00 817.00 8
1994-12-06 Perforation 3180.00 3186.00 13
2010-06-14 Fracture 816.00 826.00 0
1994-12-07 Acid Treatment 3176.00 3186.00 0
1994-12-08 Perforation 3143.00 3158.00 13
1994-12-10 Acid Treatment 3143.00 3158.00 0
1994-12-13 Fracture 3143.00 3158.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 1980 0.0 0.0 0.0
2002 8537 0.0 0.0 0.0
2003 8328 0.0 0.0 0.0
2004 7777 0.0 0.0 0.0
2005 6852 0.0 0.0 0.0
2006 8238 0.0 0.0 0.0
2007 4883 0.0 0.0 0.0
2008 3550 0.0 0.0 0.0
2009 6937 0.0 0.0 0.0
2010 5132 0.0 0.0 0.0
2011 7854 0.0 0.0 0.0
2012 7710 0.0 0.0 0.0
2013 7438 0.0 0.0 0.0
2014 6888 0.0 0.0 0.0
2015 8526 0.0 0.0 0.0
2016 8248 0.0 0.0 0.0
2017 7937 0.0 0.0 0.0
2018 8262 0.0 0.0 0.0
2019 7826 0.0 0.0 0.0
2020 1803 0.0 0.0 0.0

For data sources see[6]

References