X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0195020911000

Well Details

Well ID: 0195020911000
Loading map...
Location: 00/11-09-019-02W5/0
Location Alias: 00/11-09-19-02 W5M
Location Alias 2: 00/11-09-019-02 W5/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 02
Section: 09
County/Municipality: Foothills County
Well Name: CPEC TV 11-9-19-2
Operator Name: Crescent Point Energy Corp.
License Number: 0162045
License Date: 1993-11-04
License Status: Amended
Spud Date: 1993-11-28
Final Drill Date: 1994-02-22
Well Total Depth: 4052.00 m
Surface Hole Latitude: 50.594277
Surface Hole Longitude: -114.224719

For data sources see[1][2]

Well History

Date Event
1993-11-04 Obtained License
1993-12-01 Surface Casing Operation Performed
1993-12-26 Well Log Performed
1993-12-28 Intermediate Casing Operation Performed
1994-01-01 Direction Drilling Operation Performed - Deviate
1994-02-01 Drill Stem Test Performed
1994-02-04 Well Log Performed
1994-02-07 Liner Casing Operation Performed
1994-02-22 Finished Drilling
1994-02-23 Well Log Performed
1994-02-25 Liner Casing Operation Performed
1994-02-26 Rig Released
1994-03-16 Perforation Treatment Performed - Jet Perforation
1994-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-22 Perforation Treatment Performed - Cement Squeeze
1994-03-22 Plug Back Performed
1994-03-27 Perforation Treatment Performed - Jet Perforation
1994-03-27 Well Log Performed
1994-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-03-31 Perforation Treatment Performed - Jet Perforation
1994-03-31 Plug Back Performed
1994-03-31 Well Log Performed
1994-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-04-03 Perforation Treatment Performed - Jet Perforation
1994-04-03 Plug Back Performed
1994-04-03 Well Log Performed
1994-04-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-04-07 Perforation Treatment Performed - Jet Perforation
1994-04-07 Plug Back Performed
1994-04-07 Well Log Performed
1994-04-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-04-16 Perforation Treatment Performed - Jet Perforation
1994-04-16 Plug Back Performed
1994-04-16 Well Log Performed
1994-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-04-20 Perforation Treatment Performed - Fractured
1994-04-20 Perforation Treatment Performed - Jet Perforation
1994-04-20 Plug Back Performed
1994-04-21 Well Log Performed
1994-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-22 Perforation Treatment Performed - Jet Perforation
1994-04-22 Well Log Performed
1994-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-27 Well Log Performed
1994-04-28 Perforation Treatment Performed - Jet Perforation
1994-05-01 Perforation Treatment Performed - Cement Squeeze
1994-05-01 Plug Back Performed
1994-05-03 Well Log Performed
1994-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-09-12 Plug Back Performed
1994-09-12 Well Mode changed to Abandoned and Whipstocked
1997-06-08 Well Log Performed
1997-06-09 Well Log Performed
1997-06-12 Well Log Performed
2001-03-09 Well Log Performed
2001-03-10 Well Log Performed
2001-05-18 Well Log Performed
2001-05-25 Well Log Performed
2001-06-06 Well Log Performed
2001-06-13 Well Log Performed
2001-06-15 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-01-01 1783.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-03-16 Perforation 3126.00 3131.00 13
1994-04-02 Acid Treatment 3755.00 3763.00 0
1994-04-03 Packing Device Capped w/Cement 3742.00 3750.00 0
1994-04-03 Perforation 3622.00 3631.00 13
1994-04-07 Packing Device Capped w/Cement 3612.00 3620.00 0
1994-04-07 Perforation 3593.00 3602.50 13
1994-04-12 Acid Treatment 3593.00 3602.50 0
1994-04-16 Packing Device Capped w/Cement 3584.00 3592.00 0
1994-04-16 Perforation 3525.00 3531.50 20
1994-04-17 Acid Treatment 3525.00 3531.50 0
1994-04-19 Acid Treatment 3525.00 3531.50 0
1994-03-20 Acid Treatment 3126.00 3131.00 0
1994-04-20 Packing Device Capped w/Cement 3515.00 3523.00 0
1994-04-20 Perforation 3113.00 3121.00 18
1994-04-20 Fracture 3113.00 3121.00 0
1994-04-22 Perforation 3113.00 3121.00 18
1994-04-22 Acid Treatment 3113.00 3121.00 0
1994-04-24 Acid Treatment 3113.00 3121.00 0
1994-04-28 Perforation 1706.00 1709.00 13
1994-04-28 Perforation 1741.00 1744.00 13
1994-05-01 Cement Squeeze 1706.00 1744.00 0
1994-09-12 Packing Device Capped w/Cement 3103.00 3111.00 0
1994-03-22 Cement Squeeze 3126.00 3131.00 0
1994-03-27 Perforation 3969.00 3985.00 13
1994-03-28 Acid Treatment 3969.00 3985.00 0
1994-03-29 Acid Treatment 3969.00 3985.00 0
1994-03-31 Packing Device Capped w/Cement 3957.00 3965.00 0
1994-03-31 Perforation 3755.00 3763.00 13
1994-04-01 Acid Treatment 3755.00 3763.00 0

For data sources see[5]



References