X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0195020702033

Well Details

Well ID: 0195020702033
Loading map...
Location: 03/02-07-019-02W5/3
Location Alias: 03/02-07-19-02 W5M
Location Alias 2: 03/02-07-019-02 W5/03
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 02
Section: 07
County/Municipality: Foothills County
Well Name: CPEC 02 PAC PETE 5 TV 6-7-19-2
Operator Name: Crescent Point Energy Corp.
License Number: B0000087
License Date: 1939-12-02
License Status: Amended
Spud Date: 2001-06-14
Final Drill Date: 2001-07-10
Well Total Depth: 3023.00 m
Surface Hole Latitude: 50.591828
Surface Hole Longitude: -114.269337

For data sources see[1][2]

Well History

Date Event
1939-12-02 Obtained License
2001-05-14 Well Log Performed
2001-05-16 Well Log Performed
2001-06-23 Direction Drilling Operation Performed - Horizontal
2001-06-28 Intermediate Casing Operation Performed
2001-06-28 Liner Casing Operation Performed
2001-06-28 Surface Casing Operation Performed
2001-07-10 Finished Drilling
2001-07-10 Well Mode changed to Drilled and Cased
2001-07-11 Well Log Performed
2001-07-12 Rig Released
2001-07-15 Perforation Treatment Performed - Open-Hole Completion
2001-07-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-09-17 Well Log Performed
2002-09-25 Perforation Treatment Performed - Jet Perforation
2002-09-25 Well Log Performed
2002-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-09-27 Perforation Treatment Performed - Fractured
2005-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-06-23 2344.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-07-15 Open Hole/Barefoot Completion 2492.00 3023.00 0
2001-07-21 Acid Treatment 2492.00 3023.00 0
2002-09-25 Perforation 2370.00 2385.00 20
2002-09-25 Perforation 2392.00 2404.00 20
2002-09-26 Acid Treatment 2370.00 2404.00 0
2002-09-27 Fracture 2370.00 2404.00 0
2005-07-27 Acid Treatment 2675.00 3019.00 0

For data sources see[5]



References