X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0195020601000

Well Details

Well ID: 0195020601000
Loading map...
Location: 00/01-06-019-02W5/0
Location Alias: 00/01-06-19-02 W5M
Location Alias 2: 00/01-06-019-02 W5/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 02
Section: 06
County/Municipality: Foothills County
Well Name: CPEC KAMALTA NO. 1 TV 1-6-19-2
Operator Name: Crescent Point Energy Corp.
License Number: B0000062
License Date: 1939-08-22
License Status: Issued
Spud Date: 1939-11-06
Final Drill Date: 1940-05-19
Well Total Depth: 2477.40 m
Surface Hole Latitude: 50.573513
Surface Hole Longitude: -114.257974

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1939-08-22 Obtained License
1940-05-09 Production Casing Operation Performed
1940-05-19 Finished Drilling
1940-05-19 Perforation Treatment Performed - Open-Hole Completion
1940-05-19 Well Mode changed to Drilled and Cased
1940-05-20 Well Began Production
1940-05-20 Well Fluid changed to Crude Oil
1940-05-20 Well Mode changed to Flowing
1940-05-23 Perforation Treatment Performed - Acid Wash - No Pressure
1940-05-26 Perforation Treatment Performed - Acid Wash - No Pressure
1940-05-28 Perforation Treatment Performed - Acid Wash - No Pressure
1940-06-01 Perforation Treatment Performed - Acid Wash - No Pressure
1940-06-10 Perforation Treatment Performed - Acid Wash - No Pressure
1940-06-20 Perforation Treatment Performed - Bullet Perforation
1961-10-23 Well Fluid changed to Crude Oil
1961-10-23 Well Mode changed to Pumping
2011-06-28 Perforation Treatment Performed - Jet Perforation
2011-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1940-05-19 Open Hole/Barefoot Completion 2421.60 2477.40 0
2011-06-28 Perforation 2390.00 2396.00 20
2011-06-28 Perforation 2384.00 2390.00 20
2011-06-28 Perforation 2378.00 2384.00 20
2011-06-28 Perforation 2374.00 2378.00 20
2011-06-30 Acid Treatment 2374.00 2408.00 0
1940-05-23 Acid Wash 2421.60 2477.40 0
1940-05-26 Acid Wash 2421.60 2477.40 0
1940-05-28 Acid Wash 2421.60 2477.40 0
1940-06-01 Acid Wash 2421.60 2477.40 0
1940-06-10 Acid Wash 2421.60 2477.40 0
1940-06-20 Bullet Perforation 2379.00 2407.90 10
2011-06-28 Perforation 2402.00 2408.00 20
2011-06-28 Perforation 2396.00 2402.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 728 0.0 0.0 0.0
1968 7413 0.0 0.0 0.0
1969 8136 0.0 0.0 0.0
1970 8403 0.0 0.0 0.0
1971 8455 0.0 0.0 0.0
1972 7700 0.0 0.0 0.0
1973 7953 0.0 0.0 0.0
1974 8246 0.0 0.0 0.0
1975 7021 0.0 0.0 0.0
1976 8544 0.0 0.0 0.0
1977 8544 0.0 0.0 0.0
1978 8714 0.0 0.0 0.0
1979 4400 0.0 0.0 0.0
1980 3369 0.0 0.0 0.0
1981 7333 0.0 0.0 0.0
1982 8429 0.0 0.0 0.0
1983 8472 0.0 0.0 0.0
1984 8697 0.0 0.0 0.0
1985 8562 0.0 0.0 0.0
1986 8487 0.0 0.0 0.0
1987 8310 0.0 0.0 0.0
1988 8571 0.0 0.0 0.0
1989 8542 0.0 0.0 0.0
1990 8342 0.0 0.0 0.0
1991 8308 0.0 0.0 0.0
1992 8443 0.0 0.0 0.0
1993 7862 0.0 0.0 0.0
1994 8620 0.0 0.0 0.0
1995 8517 0.0 0.0 0.0
1996 8619 0.0 0.0 0.0
1997 8429 0.0 0.0 0.0
1998 8299 0.0 0.0 0.0
1999 8662 0.0 0.0 0.0
2000 8513 0.0 0.0 0.0
2001 7909 0.0 0.0 0.0
2002 8694 0.0 0.0 0.0
2003 8445 0.0 0.0 0.0
2004 7225 0.0 0.0 0.0
2005 8022 0.0 0.0 0.0
2006 8531 0.0 0.0 0.0
2007 8330 0.0 0.0 0.0
2008 8651 0.0 0.0 0.0
2009 7871 0.0 0.0 0.0
2010 8525 0.0 0.0 0.0
2011 7738 0.0 0.0 0.0
2012 8668 0.0 0.0 0.0
2013 8609 0.0 0.0 0.0
2014 8130 0.0 0.0 0.0
2015 8039 0.0 0.0 0.0
2016 8398 0.0 0.0 0.0
2017 7880 0.0 0.0 0.0
2018 8338 0.0 0.0 0.0
2019 6955 0.0 0.0 0.0
2020 1637 0.0 0.0 0.0

For data sources see[5]

References