X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0195020514000

Well Details

Well ID: 0195020514000
Loading map...
Location: 00/14-05-019-02W5/0
Location Alias: 00/14-05-19-02 W5M
Location Alias 2: 00/14-05-019-02 W5/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 02
Section: 05
County/Municipality: Foothills County
Well Name: CPEC ROYALITE 45 TV 14-5-19-2
Operator Name: Crescent Point Energy Corp.
License Number: B0000052
License Date: 1939-07-04
License Status: Suspension
Spud Date: 1939-05-10
Final Drill Date: 1939-12-23
Well Total Depth: 2281.70 m
Surface Hole Latitude: 50.584727
Surface Hole Longitude: -114.247103

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1939-07-04 Obtained License
1939-12-04 Perforation Treatment Performed - Open-Hole Completion
1939-12-08 Production Casing Operation Performed
1939-12-23 Finished Drilling
1939-12-23 Well Mode changed to Drilled and Cased
1939-12-24 Perforation Treatment Performed - Acid Wash - No Pressure
1939-12-24 Well Began Production
1939-12-24 Well Fluid changed to Crude Oil
1939-12-24 Well Mode changed to Flowing
1940-03-06 Perforation Treatment Performed - Acid Wash - No Pressure
1940-03-09 Perforation Treatment Performed - Acid Wash - No Pressure
1956-01-01 Well Fluid changed to Crude Oil
1956-01-01 Well Mode changed to Gas Lift
1975-10-15 Well Began Injection
1975-10-15 Well Fluid changed to Water
1975-10-15 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1939-12-04 Open Hole/Barefoot Completion 2156.50 2281.70 0
1939-12-24 Acid Wash 2156.50 2281.70 0
1940-03-06 Acid Wash 2156.50 2281.70 0
1940-03-09 Acid Wash 2156.50 2281.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1488 0.0 0.0 0.0
1968 7146 0.0 0.0 0.0
1969 8617 0.0 0.0 0.0
1970 8735 0.0 0.0 0.0
1971 8513 0.0 0.0 0.0
1972 7751 0.0 0.0 0.0
1973 8693 0.0 0.0 0.0
1974 3880 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0

For data sources see[5]

References