X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0195020509020

Well Details

Well ID: 0195020509020
Loading map...
Location: 02/09-05-019-02W5/0
Location Alias: 02/09-05-19-02 W5M
Location Alias 2: 02/09-05-019-02 W5/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 02
Section: 05
County/Municipality: Foothills County
Well Name: VAN PEG ROYALTIES #1
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: B0000055
License Date: 1939-07-10
License Status: RecCertified
Spud Date: 1939-08-15
Final Drill Date: 1940-03-05
Well Total Depth: 2155.50 m
Surface Hole Latitude: 50.580143
Surface Hole Longitude: -114.237237

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1939-07-10 Obtained License
1940-01-22 Production Casing Operation Performed
1940-03-05 Finished Drilling
1940-03-05 Perforation Treatment Performed - Open-Hole Completion
1940-03-05 Well Mode changed to Drilled and Cased
1940-03-13 Perforation Treatment Performed - Acid Wash - No Pressure
1940-03-13 Well Began Production
1940-03-13 Well Fluid changed to Crude Oil
1940-03-13 Well Mode changed to Flowing
1940-03-14 Perforation Treatment Performed - Acid Wash - No Pressure
1940-03-19 Perforation Treatment Performed - Acid Wash - No Pressure
1940-03-26 Perforation Treatment Performed - Acid Wash - No Pressure
1940-04-02 Perforation Treatment Performed - Acid Wash - No Pressure
1990-09-15 Perforation Treatment Performed - Cement Squeeze
1990-09-15 Perforation Treatment Performed - Jet Perforation
1990-09-15 Plug Back Performed
1990-09-15 Well Fluid changed to Crude Oil
1990-09-15 Well Mode changed to Abandoned
1990-09-16 Perforation Treatment Performed - Remedial Casing
1990-09-17 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1940-03-05 Open Hole/Barefoot Completion 1955.60 2155.50 0
1940-03-13 Acid Wash 1955.60 2155.50 0
1940-03-14 Acid Wash 1955.60 2155.50 0
1940-03-19 Acid Wash 1955.60 2155.50 0
1940-03-26 Acid Wash 1955.60 2155.50 0
1940-04-02 Acid Wash 1955.60 2155.50 0
1990-09-15 Cement Squeeze 1955.60 2155.50 0
1990-09-15 Perforation 1000.00 1001.00 13
1990-09-16 Remedial Casing Cementing 1000.00 1001.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1981 696 0.0 0.0 0.0

For data sources see[5]

References