X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0195020507020

Well Details

Well ID: 0195020507020
Loading map...
Location: 02/07-05-019-02W5/0
Location Alias: 02/07-05-19-02 W5M
Location Alias 2: 02/07-05-019-02 W5/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 02
Section: 05
County/Municipality: Foothills County
Well Name: CPEC HERRIMAN #7 HZ TV 7-5-19-2
Operator Name: Crescent Point Energy Corp.
License Number: 0461891
License Date: 2013-12-04
License Status: Amended
Spud Date: 2014-01-03
Final Drill Date: 2014-01-29
Well Total Depth: 3468.00 m
Surface Hole Latitude: 50.576193
Surface Hole Longitude: -114.256868

For data sources see[1][2]

Well History

Date Event
2013-01-31 Well Log Performed
2013-12-04 Obtained License
2014-01-05 Surface Casing Operation Performed
2014-01-15 Direction Drilling Operation Performed - Deviate
2014-01-18 Well Log Performed
2014-01-19 Intermediate Casing Operation Performed
2014-01-20 Well Log Performed
2014-01-22 Direction Drilling Operation Performed - Horizontal
2014-01-29 Finished Drilling
2014-01-29 Well Log Performed
2014-01-29 Well Mode changed to Drilled and Cased
2014-01-30 Well Log Performed
2014-01-31 Well Log Performed
2014-02-08 Well Log Performed
2014-02-23 Perforation Treatment Performed - Open-Hole Completion
2014-02-23 Rig Released
2014-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-03-21 Well Began Production
2014-03-21 Well Fluid changed to Crude Oil
2014-03-21 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-01-03 Trinidad Drilling Ltd. 51 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-01-15 2085.40 Deviate (5 - 79 degrees)
2014-01-22 2476.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-02-23 Open Hole/Barefoot Completion 2322.00 3468.00 0
2014-03-11 Acid Treatment 2472.10 3468.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 6475 0.0 0.0 0.0
2015 8285 0.0 0.0 0.0
2016 8406 0.0 0.0 0.0
2017 8501 0.0 0.0 0.0
2018 8466 0.0 0.0 0.0
2019 8592 0.0 0.0 0.0
2020 1859 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-02-23 No Incident Encountered 0.00 0.00
2014-03-21 No Incident Encountered 0.00 0.00

For data sources see[8]

References