X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194293506023

Well Details

Well ID: 0194293506023
Loading map...
Location: 02/06-35-019-29W4/3
Location Alias: 02/06-35-19-29 W4M
Location Alias 2: 02/06-35-019-29 W4/03
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 29
Section: 35
County/Municipality: Foothills County
Well Name: COMPTON OKOTOKS 6-35-19-29
Operator Name: Lexin Resources Ltd.
License Number: 0192484
License Date: 1996-10-21
License Status: Suspension
Spud Date: 1996-10-30
Final Drill Date: 1997-06-10
Well Total Depth: 2898.00 m
Surface Hole Latitude: 50.655674
Surface Hole Longitude: -113.913087

For data sources see[1][2]

Well History

Date Event
1996-10-21 Obtained License
1997-05-18 Direction Drilling Operation Performed - Horizontal
1997-06-03 Direction Drilling Operation Performed - Horizontal
1997-06-10 Finished Drilling
1997-06-10 Perforation Treatment Performed - Open-Hole Completion
1997-06-10 Well Log Performed
1997-06-10 Well Mode changed to Drilled and Cased
1997-06-12 Liner Casing Operation Performed
1997-06-13 Rig Released
1997-08-09 Well Began Production
1997-08-09 Well Fluid changed to Gas
1997-08-09 Well Mode changed to Flowing
1999-05-12 Well Log Performed
1999-05-13 Perforation Treatment Performed - Jet Perforation
1999-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-03-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-15 Plug Back Performed
2001-03-15 Well Fluid changed to Gas
2001-03-15 Well Mode changed to Abandoned Zone
2001-03-17 Perforation Treatment Performed - Jet Perforation
2001-03-18 Perforation Treatment Performed - Fractured
2001-03-18 Perforation Treatment Performed - Jet Perforation
2002-05-27 Perforation Treatment Performed - Open-Hole Completion
2002-05-28 Perforation Treatment Performed - Cement Squeeze
2002-05-28 Perforation Treatment Performed - Jet Perforation
2002-05-28 Plug Back Performed
2002-06-14 Perforation Treatment Performed - Jet Perforation
2002-06-18 Perforation Treatment Performed - Fractured
2019-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-08-09 Plug Back Performed
2019-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-08-10 Perforation Treatment Performed - Jet Perforation
2019-08-10 Plug Back Performed
2019-08-10 Well Log Performed
2019-08-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-08-11 Perforation Treatment Performed - Cement Squeeze
2019-08-11 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-05-18 2167.00 Horizontal
1997-06-03 2625.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-06-10 Open Hole/Barefoot Completion 2500.00 2898.00 0
2002-05-28 Cement Squeeze 1154.00 1157.00 0
2002-05-28 Cement Squeeze 829.00 832.00 0
2002-06-14 Perforation 2390.50 2392.50 14
2002-06-14 Perforation 2397.00 2401.00 14
2002-06-18 Fracture 2390.00 2401.00 0
2019-08-09 Packing Device Capped w/Cement 2355.00 2378.00 0
2019-08-10 Packing Device Capped w/Cement 2140.00 2148.00 0
2019-08-10 Packing Device Capped w/Cement 1139.00 1147.00 0
2019-08-10 Packing Device Capped w/Cement 814.00 822.00 0
2019-08-10 Perforation 600.00 601.00 17
1999-05-13 Perforation 2465.00 2468.00 14
2019-08-11 Cement Squeeze 600.00 601.00 0
2019-08-11 Packing Device Capped w/Cement 577.50 598.00 0
1999-05-14 Acid Treatment 2465.00 2468.00 0
2001-03-15 Packing Device Capped w/Cement 2332.00 2400.00 0
2001-03-17 Perforation 1154.00 1157.00 14
2001-03-18 Perforation 829.00 832.00 14
2001-03-18 Fracture 829.00 1157.00 0
2002-05-27 Open Hole/Barefoot Completion 2501.00 2898.00 0
2002-05-28 Perforation 2465.00 2468.00 14

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 1670 0.0 0.0 0.0
1998 4928 0.0 0.0 0.0
1999 9 0.0 0.0 0.0
2001 1 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-08-11 No Incident Encountered 0.00 0.00

For data sources see[7]

References