X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194252616000

Well Details

Well ID: 0194252616000
Loading map...
Location: 00/16-26-019-25W4/0
Location Alias: 00/16-26-19-25 W4M
Location Alias 2: 00/16-26-019-25 W4/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 25
Section: 26
County/Municipality: Vulcan County
Well Name: PWEI HERRON 16-26-19-25
Operator Name: TAQA North Ltd.
License Number: 0303685
License Date: 2004-02-09
License Status: Abandoned
Spud Date: 2004-02-20
Final Drill Date: 2004-02-26
Well Total Depth: 1840.00 m
Surface Hole Latitude: 50.644632
Surface Hole Longitude: -113.352748

For data sources see[1][2]

Well History

Date Event
2004-02-09 Obtained License
2004-02-22 Surface Casing Operation Performed
2004-02-24 Direction Drilling Operation Performed - Deviate
2004-02-26 Finished Drilling
2004-02-26 Well Log Performed
2004-02-26 Well Mode changed to Drilled and Cased
2004-02-28 Production Casing Operation Performed
2004-02-28 Rig Released
2004-04-24 Well Log Performed
2004-04-26 Perforation Treatment Performed - Jet Perforation
2004-04-26 Well Log Performed
2004-04-27 Perforation Treatment Performed - Fractured
2006-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-01-18 Plug Back Performed
2006-01-18 Well Log Performed
2006-01-18 Well Mode changed to Abandoned Zone
2006-01-19 Well Log Performed
2006-01-22 Perforation Treatment Performed - Jet Perforation
2006-01-22 Well Log Performed
2006-01-23 Perforation Treatment Performed - Remedial Casing
2006-02-12 Well Log Performed
2006-02-19 Well Log Performed
2006-03-19 Perforation Treatment Performed - Jet Perforation
2006-03-20 Perforation Treatment Performed - Remedial Casing
2007-02-01 Well Log Performed
2007-02-03 Perforation Treatment Performed - Jet Perforation
2007-02-03 Well Log Performed
2007-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-04 Perforation Treatment Performed - Remedial Casing
2007-02-06 Perforation Treatment Performed - Jet Perforation
2007-02-06 Well Log Performed
2007-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-07 Perforation Treatment Performed - Remedial Casing
2007-02-07 Well Log Performed
2007-02-09 Perforation Treatment Performed - Jet Perforation
2007-02-09 Well Log Performed
2007-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-10 Perforation Treatment Performed - Remedial Casing
2007-02-11 Perforation Treatment Performed - Jet Perforation
2007-02-11 Well Log Performed
2007-02-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-12 Perforation Treatment Performed - Remedial Casing
2007-02-14 Well Log Performed
2007-02-20 Perforation Treatment Performed - Jet Perforation
2007-02-20 Well Log Performed
2007-02-22 Perforation Treatment Performed - Remedial Casing
2007-02-27 Perforation Treatment Performed - Jet Perforation
2007-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-28 Perforation Treatment Performed - Remedial Casing
2007-03-01 Perforation Treatment Performed - Cement Plug
2007-12-22 Well Abandoned
2007-12-22 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2004-02-24 317.20 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-04-26 Perforation 1771.50 1774.50 20
2006-03-20 Remedial Casing Cementing 570.00 572.00 0
2007-02-03 Perforation 939.00 941.00 20
2007-02-04 Remedial Casing Cementing 939.00 941.00 0
2007-02-04 Packing Device Capped w/Cement 923.00 935.00 0
2007-02-06 Perforation 899.50 901.00 20
2007-02-06 Perforation 869.00 871.00 20
2007-02-06 Perforation 870.00 870.30 99
2007-02-07 Remedial Casing Cementing 899.50 901.00 0
2007-02-07 Packing Device Capped w/Cement 884.00 896.00 0
2007-02-07 Remedial Casing Cementing 869.00 871.00 0
2004-04-27 Fracture 1771.50 1774.50 0
2007-02-07 Packing Device Capped w/Cement 854.00 866.00 0
2007-02-09 Perforation 828.00 830.00 20
2007-02-09 Perforation 822.50 824.00 20
2007-02-09 Perforation 823.00 823.30 99
2007-02-10 Remedial Casing Cementing 822.50 830.00 0
2007-02-10 Packing Device Capped w/Cement 806.00 820.00 0
2007-02-11 Perforation 777.50 779.00 20
2007-02-11 Perforation 771.00 773.00 20
2007-02-11 Perforation 772.00 772.30 99
2007-02-12 Remedial Casing Cementing 777.50 779.00 0
2006-01-18 Packing Device Capped w/Cement 1761.00 1768.00 0
2007-02-12 Remedial Casing Cementing 771.00 773.00 0
2007-02-12 Packing Device Capped w/Cement 755.00 775.00 0
2007-02-20 Perforation 677.00 678.00 20
2007-02-20 Perforation 667.50 668.50 20
2007-02-20 Perforation 670.00 672.50 20
2007-02-20 Perforation 677.30 677.60 99
2007-02-20 Perforation 668.00 668.30 99
2007-02-22 Remedial Casing Cementing 667.50 678.00 0
2007-02-27 Perforation 572.00 576.00 99
2007-02-28 Packing Device Capped w/Cement 657.00 665.00 0
2006-01-22 Perforation 680.00 681.00 21
2007-02-28 Remedial Casing Cementing 572.00 576.00 0
2007-03-01 Cement Plug 555.00 591.00 0
2006-01-22 Perforation 680.50 680.80 72
2006-01-23 Remedial Casing Cementing 680.00 681.00 0
2006-03-19 Perforation 570.30 570.60 23
2006-03-19 Perforation 570.00 572.00 23
2006-03-19 Perforation 570.00 572.00 23

For data sources see[5]



References