X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194240514002

Well Details

Well ID: 0194240514002
Loading map...
Location: 00/14-05-019-24W4/2
Location Alias: 00/14-05-19-24 W4M
Location Alias 2: 00/14-05-019-24 W4/02
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 24
Section: 05
County/Municipality: Vulcan County
Well Name: CYPRESS FARROW 14-5-19-24
Operator Name: TAQA North Ltd.
License Number: 0159298
License Date: 1993-06-21
License Status: Suspension
Spud Date: 1993-06-30
Final Drill Date: 1993-07-13
Well Total Depth: 1875.00 m
Surface Hole Latitude: 50.583671
Surface Hole Longitude: -113.294826

For data sources see[1][2]

Well History

Date Event
1993-06-21 Obtained License
1993-07-02 Surface Casing Operation Performed
1993-07-05 Well Log Performed
1993-07-06 Drill Stem Test Performed
1993-07-13 Finished Drilling
1993-07-13 Well Log Performed
1993-07-13 Well Mode changed to Drilled and Cased
1993-07-15 Drill Stem Test Performed
1993-07-16 Drill Stem Test Performed
1993-07-17 Drill Stem Test Performed
1993-07-18 Production Casing Operation Performed
1993-07-19 Rig Released
1993-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-29 Perforation Treatment Performed - Jet Perforation
1993-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-07-31 Perforation Treatment Performed - Jet Perforation
1993-07-31 Well Log Performed
1993-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-08-04 Perforation Treatment Performed - Fractured
1993-08-21 Perforation Treatment Performed - Jet Perforation
1993-08-21 Well Log Performed
1993-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-08-30 Perforation Treatment Performed - Fractured
1993-09-29 Well Log Performed
1993-09-30 Perforation Treatment Performed - Jet Perforation
1994-01-07 Well Began Production
1994-01-07 Well Fluid changed to Gas
1994-01-07 Well Mode changed to Flowing
1994-05-04 Perforation Treatment Performed - Jet Perforation
1996-12-07 Perforation Treatment Performed - Jet Perforation
1998-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-01-16 Plug Back Performed
1998-01-16 Well Fluid changed to Gas
1998-01-16 Well Mode changed to Flowing
1998-01-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-01-18 Plug Back Performed
2011-02-08 Perforation Treatment Performed - Bridge Plug No Cement Required
2011-12-01 Well Fluid changed to Gas
2011-12-01 Well Mode changed to Suspended
2012-06-05 Perforation Treatment Performed - Cement Plug
2012-06-05 Perforation Treatment Performed - Cement Squeeze
2012-06-05 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-07-29 Perforation 1831.50 1834.00 13
1993-08-30 Fracture 934.50 940.00 0
1993-09-30 Perforation 829.50 831.50 13
1993-09-30 Perforation 833.00 835.00 13
1994-05-04 Perforation 733.00 735.00 13
1994-05-04 Perforation 718.00 721.50 13
1994-05-04 Perforation 697.00 698.00 13
1994-05-04 Perforation 686.50 690.00 13
1994-05-04 Perforation 679.50 680.50 13
1996-12-07 Perforation 521.00 522.00 18
1998-01-16 Packing Device Capped w/Cement 1783.00 1791.00 0
1993-07-29 Perforation 1835.50 1837.50 13
1998-01-18 Packing Device Capped w/Cement 1497.00 1505.00 0
1998-01-18 Packing Device Capped w/Cement 917.00 925.00 0
2011-02-08 Bridge Plug, No Cement 515.00 515.50 0
2012-06-05 Cement Plug 835.00 850.00 0
2012-06-05 Cement Squeeze 833.00 835.00 0
2012-06-05 Cement Squeeze 829.50 831.50 0
2012-06-05 Cement Plug 735.00 829.50 0
2012-06-05 Cement Squeeze 733.00 735.00 0
2012-06-05 Cement Squeeze 718.00 721.50 0
2012-06-05 Cement Plug 698.00 718.00 0
1993-07-29 Acid Treatment 1831.50 1837.50 0
2012-06-05 Cement Squeeze 697.00 698.00 0
2012-06-05 Cement Squeeze 686.50 690.00 0
2012-06-05 Cement Squeeze 679.50 680.50 0
2012-06-05 Cement Plug 522.00 679.50 0
2012-06-05 Cement Squeeze 521.00 522.00 0
2012-06-05 Cement Plug 200.00 521.00 0
1993-07-31 Packing Device Capped w/Cement 1822.00 1830.00 0
1993-07-31 Perforation 1814.00 1816.00 13
1993-08-01 Acid Treatment 1814.00 1816.00 0
1993-08-04 Fracture 1814.00 1816.00 0
1993-08-21 Perforation 934.50 940.00 13
1993-08-26 Acid Treatment 934.50 940.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 6448 0.0 0.0 0.0
1995 8717 0.0 0.0 0.0
1996 8479 0.0 0.0 0.0
1997 7818 0.0 0.0 0.0
1998 4631 0.0 0.0 0.0
1999 2185 0.0 0.0 0.0
2000 1419 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References