X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194162102000

Well Details

Well ID: 0194162102000
Loading map...
Location: 00/02-21-019-16W4/0
Location Alias: 00/02-21-19-16 W4M
Location Alias 2: 00/02-21-019-16 W4/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 16
Section: 21
County/Municipality: County of Newell
Well Name: LL&E CPOG COUNTESS 2-21-19-16
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0040038
License Date: 1971-05-07
License Status: RecCertified
Spud Date: 1971-05-10
Final Drill Date: 1971-05-14
Well Total Depth: 1143.00 m
Surface Hole Latitude: 50.618207
Surface Hole Longitude: -112.160913

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-05-07 Obtained License
1971-05-14 Finished Drilling
1971-05-14 Well Mode changed to Drilled and Cased
1971-05-15 Production Casing Operation Performed
1971-05-25 Perforation Treatment Performed - Jet Perforation
1971-05-27 Well Began Production
1971-05-27 Well Fluid changed to Crude Oil
1971-05-27 Well Mode changed to Flowing
1972-09-30 Well Fluid changed to Crude Oil
1972-09-30 Well Mode changed to Suspended
1985-05-01 Well Fluid changed to Crude Oil
1985-05-01 Well Mode changed to Pumping
1987-06-18 Well Fluid changed to Crude Oil
1987-06-18 Well Mode changed to Suspended
1993-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-25 Perforation Treatment Performed - Jet Perforation
1993-08-25 Plug Back Performed
1993-08-25 Well Log Performed
1993-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-08-26 Perforation Treatment Performed - Remedial Casing
1993-08-26 Well Fluid changed to Crude Oil
1993-08-26 Well Mode changed to Abandoned
1993-12-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-05-25 Perforation 1080.80 1082.00 13
1993-08-25 Packing Device Capped w/Cement 1061.00 1069.00 0
1993-08-25 Perforation 228.00 229.00 14
1993-08-26 Acid Treatment 228.00 229.00 0
1993-08-26 Remedial Casing Cementing 228.00 229.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 3306 0.0 0.0 0.0
1972 767 0.0 0.0 0.0
1985 5343 0.0 0.0 0.0
1986 8186 0.0 0.0 0.0
1987 3763 0.0 0.0 0.0

For data sources see[5]

References