X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194141201000

Well Details

Well ID: 0194141201000
Loading map...
Location: 00/01-12-019-14W4/0
Location Alias: 00/01-12-19-14 W4M
Location Alias 2: 00/01-12-019-14 W4/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 14
Section: 12
County/Municipality: County of Newell
Well Name: RENAISSANCE 1A BANTRY 1-12-19-14
Operator Name: Husky Oil Operations Limited
License Number: 0232141
License Date: 2000-01-17
License Status: RecCertified
Spud Date: 2000-01-23
Final Drill Date: 2000-01-26
Well Total Depth: 1041.00 m
Surface Hole Latitude: 50.587053
Surface Hole Longitude: -111.807711

For data sources see[1][2]

Well History

Date Event
2000-01-17 Obtained License
2000-01-24 Surface Casing Operation Performed
2000-01-26 Finished Drilling
2000-01-26 Kick Occurred
2000-01-27 Well Log Performed
2000-01-28 Production Casing Operation Performed
2000-01-28 Rig Released
2000-01-28 Well Mode changed to Drilled and Cased
2000-02-03 Perforation Treatment Performed - Jet Perforation
2000-02-03 Well Log Performed
2000-02-04 Perforation Treatment Performed - Cement Squeeze
2000-02-04 Perforation Treatment Performed - Jet Perforation
2000-02-04 Plug Back Performed
2000-02-08 Perforation Treatment Performed - Jet Perforation
2000-02-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-02-09 Plug Back Performed
2000-02-09 Well Mode changed to Abandoned Zone
2001-12-19 Well Log Performed
2001-12-20 Perforation Treatment Performed - Abrasa-Jet Perforation
2001-12-21 Perforation Treatment Performed - Remedial Casing
2002-01-02 Well Log Performed
2002-01-03 Perforation Treatment Performed - Abrasa-Jet Perforation
2002-01-03 Perforation Treatment Performed - Remedial Casing
2002-04-16 Well Log Performed
2002-04-19 Perforation Treatment Performed - Abrasa-Jet Perforation
2002-04-19 Perforation Treatment Performed - Remedial Casing
2011-11-06 Well Log Performed
2011-11-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-08 Perforation Treatment Performed - Jet Perforation
2011-11-08 Well Log Performed
2011-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-11-12 Perforation Treatment Performed - Jet Perforation
2011-11-12 Well Log Performed
2011-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-14 Perforation Treatment Performed - Remedial Casing
2011-11-15 Perforation Treatment Performed - Jet Perforation
2011-11-15 Well Log Performed
2011-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-11-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-19 Perforation Treatment Performed - Remedial Casing
2011-11-21 Well Log Performed
2011-12-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-12-04 Plug Back Performed
2011-12-04 Well Log Performed
2012-12-07 Well Abandoned
2012-12-07 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-02-03 Perforation 1014.00 1016.00 13
2002-01-03 Remedial Casing Cementing 319.50 320.00 0
2002-04-19 Hydra Jet Perforation 279.50 280.00 2
2002-04-19 Remedial Casing Cementing 279.50 280.00 0
2011-11-08 Packing Device Capped w/Cement 522.00 530.00 0
2011-11-08 Perforation 445.00 448.00 20
2011-11-08 Perforation 445.00 448.00 17
2011-11-08 Perforation 445.00 445.90 99
2011-11-12 Acid Treatment 445.00 448.00 0
2011-11-12 Perforation 446.00 447.00 20
2011-11-12 Perforation 447.10 448.00 99
2000-02-04 Perforation 1018.00 1019.00 13
2011-11-14 Remedial Casing Cementing 446.00 448.00 0
2011-11-14 Packing Device Capped w/Cement 425.00 440.00 0
2011-11-15 Perforation 320.00 323.00 20
2011-11-15 Perforation 320.00 323.00 17
2011-11-15 Perforation 320.00 320.90 99
2011-11-18 Acid Treatment 320.00 323.00 0
2011-11-19 Remedial Casing Cementing 320.00 323.00 0
2011-11-19 Packing Device Capped w/Cement 305.00 315.00 0
2011-12-04 Packing Device Capped w/Cement 265.00 275.00 0
2000-02-04 Cement Squeeze 1018.00 1019.00 0
2000-02-04 Cement Squeeze 1014.00 1016.00 0
2000-02-08 Perforation 1009.00 1012.00 13
2000-02-09 Packing Device Capped w/Cement 1000.50 1008.50 0
2001-12-20 Hydra Jet Perforation 533.00 533.50 2
2001-12-21 Remedial Casing Cementing 533.00 533.50 0
2002-01-03 Hydra Jet Perforation 319.50 320.00 2

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2000-01-26 Kick 1041.00 1041.00

For data sources see[5]

References