X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194131713000

Well Details

Well ID: 0194131713000
Loading map...
Location: 00/13-17-019-13W4/0
Location Alias: 00/13-17-19-13 W4M
Location Alias 2: 00/13-17-019-13 W4/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 13
Section: 17
County/Municipality: County of Newell
Well Name: PRINCESS-BROOKS SYNDICATE C.P.R. #1
Operator Name: Obsidian Energy Ltd.
License Number: 0001452
License Date: 1946-08-19
License Status: RecExempt
Spud Date: 1946-08-24
Final Drill Date: 1946-09-21
Well Total Depth: 1040.90 m
Surface Hole Latitude: 50.614809
Surface Hole Longitude: -111.780231

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1946-08-19 Obtained License
1946-09-13 Drill Stem Test Performed
1946-09-16 Drill Stem Test Performed
1946-09-17 Drill Stem Test Performed
1946-09-19 Drill Stem Test Performed
1946-09-21 Finished Drilling
1946-09-21 Well Mode changed to Drilled and Cased
1946-09-22 Production Casing Operation Performed
1946-09-28 Perforation Treatment Performed - Bullet Perforation
1946-12-12 Well Began Production
1946-12-12 Well Fluid changed to Gas
1946-12-12 Well Mode changed to Flowing
1966-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1966-06-23 Perforation Treatment Performed - Jet Perforation
1966-06-23 Well Abandoned
1966-06-23 Well Fluid changed to Gas
1966-06-23 Well Mode changed to Abandoned Zone
1966-06-24 Perforation Treatment Performed - Jet Perforation
1966-06-28 Perforation Treatment Performed - Jet Perforation
2006-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-08-23 Plug Back Performed
2006-08-24 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1946-09-28 Bullet Perforation 998.80 1002.20 20
1966-06-28 Perforation 894.00 895.50 16
2006-08-23 Packing Device Capped w/Cement 973.10 981.10 0
1966-06-23 Packing Device Capped w/Cement 993.60 994.30 0
1966-06-23 Perforation 935.40 937.00 13
1966-06-24 Perforation 876.00 877.50 13
1966-06-24 Perforation 871.70 872.90 13
1966-06-28 Perforation 871.10 873.30 13
1966-06-28 Perforation 874.50 877.20 10
1966-06-28 Perforation 879.30 880.60 13
1966-06-28 Perforation 881.20 881.80 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0

For data sources see[5]

References