X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194090604000

Well Details

Well ID: 0194090604000
Loading map...
Location: 00/04-06-019-09W4/0
Location Alias: 00/04-06-19-09 W4M
Location Alias 2: 00/04-06-019-09 W4/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 09
Section: 06
County/Municipality: Cypress County
Well Name: CARDINAL HZ JENNER 4-6-19-9
Operator Name: Cardinal Energy Ltd.
License Number: 0480301
License Date: 2016-09-07
License Status: Suspension
Spud Date: 2016-09-20
Final Drill Date: 2016-09-26
Well Total Depth: 1945.00 m
Surface Hole Latitude: 50.581317
Surface Hole Longitude: -111.242806

For data sources see[1][2]

Well History

Date Event
2016-09-07 Obtained License
2016-09-21 Surface Casing Operation Performed
2016-09-22 Direction Drilling Operation Performed - Deviate
2016-09-23 Direction Drilling Operation Performed - Horizontal
2016-09-23 Well Log Performed
2016-09-24 Intermediate Casing Operation Performed
2016-09-26 Finished Drilling
2016-09-26 Well Log Performed
2016-09-26 Well Mode changed to Drilled and Cased
2016-09-27 Liner Casing Operation Performed
2016-09-27 Perforation Treatment Performed - Open-Hole Completion
2016-09-27 Rig Released
2016-10-12 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-20 Well Began Production
2016-10-20 Well Fluid changed to Crude Oil
2016-10-20 Well Mode changed to Pumping
2017-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-02-16 Plug Back Performed
2017-02-16 Well Fluid changed to Crude Oil
2017-02-16 Well Mode changed to Abandoned Zone
2017-02-26 Well Log Performed
2017-02-27 Perforation Treatment Performed - Jet Perforation
2017-02-28 Perforation Treatment Performed - Cement Plug
2018-10-16 Well Log Performed
2019-06-25 Perforation Treatment Performed - Jet Perforation
2019-06-26 Perforation Treatment Performed - Cement Plug
2019-06-26 Perforation Treatment Performed - Cement Squeeze
2019-12-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-12-09 Perforation Treatment Performed - Jet Perforation
2019-12-10 Perforation Treatment Performed - Cement Plug

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-09-20 Quintera Drilling Ltd. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-09-22 764.80 Deviate (5 - 79 degrees)
2016-09-23 1138.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-09-27 Open Hole/Barefoot Completion 1855.00 1945.00 0
2017-02-16 Packing Device Capped w/Cement 1081.30 1130.00 0
2017-02-27 Perforation 635.00 637.00 20
2017-02-27 Perforation 651.00 653.00 20
2017-02-28 Cement Plug 565.90 670.00 0
2019-06-25 Perforation 469.00 471.00 17
2019-06-26 Cement Squeeze 469.00 471.00 0
2019-06-26 Cement Plug 463.00 469.00 0
2019-12-09 Perforation 340.50 342.50 20
2019-12-09 Packing Device Capped w/Cement 326.50 336.50 0
2019-12-10 Cement Plug 336.50 342.50 0
2016-10-12 Multi-Stage Fracture 1803.00 1804.30 0
2016-10-12 Multi-Stage Fracture 1729.00 1729.90 0
2016-10-12 Multi-Stage Fracture 1644.00 1644.80 0
2016-10-12 Multi-Stage Fracture 1559.20 1560.00 0
2016-10-12 Multi-Stage Fracture 1487.20 1488.00 0
2016-10-12 Multi-Stage Fracture 1401.60 1402.50 0
2016-10-12 Multi-Stage Fracture 1329.20 1330.10 0
2016-10-12 Multi-Stage Fracture 1243.40 1244.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-10-12 2016-10-12 1,009 717 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 1.3822 N/A
water Not Available 100 72.4225 N/A
CRC-LT (20/40) Trican phenolic resin 9003-35-4 100 25.2505 N/A
silica crystalline 14808-60-7 100 25.2505 N/A
Activator-W Trican Activator alcohols. C12-14-secondary. ethoxylated 84133-50-6 100 0.2966 N/A
methanol 67-56-1 100 0.2966 N/A
polyethylene glycol 25322-68-3 100 0.2966 N/A
BXL-A Trican Breaker diethanolamine 111-42-2 100 0.0778 N/A
non-hazardous ingredients Not Available 100 0.0778 N/A
triethanolamine 102-71-6 100 0.0778 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0362 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1354 N/A
non-hazardous ingredients Not Available 100 0.1354 N/A
WXB-10 Trican Crosslinker borate salts 1319-33-1 100 0.1825 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.1825 N/A
DF-2W Trican Defoamer non-hazardous ingredients Not Available 100 0.0074 N/A
propylene glycol 57-55-6 100 0.0074 N/A
WG-111d Trican Gelling Agent guar gum 9000-30-0 100 0.1738 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0347 N/A
methanol 67-56-1 100 0.0347 N/A
water Not Available 100 0.0347 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-10-03 2016-10-06 Municipal Water 420
2016-10-04 2016-10-06 Municipal Water 152
2016-10-06 2016-10-06 Municipal Water 90
2016-10-03 2016-10-04 Recycled Fracturing Water (treated at well site) 433

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 379 0.0 0.0 0.0
2017 63 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-09-27 No Incident Encountered 0.00 0.00
2017-03-01 No Incident Encountered 0.00 0.00
2019-06-27 No Incident Encountered 0.00 0.00
2019-12-11 No Incident Encountered 0.00 0.00

For data sources see[10]

References