X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194082710060

Well Details

Well ID: 0194082710060
Loading map...
Location: 06/10-27-019-08W4/0
Location Alias: 06/10-27-19-08 W4M
Location Alias 2: 06/10-27-019-08 W4/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 08
Section: 27
County/Municipality: Cypress County
Well Name: CVE 2C-27 SUFFIELD 10-27-19-8
Operator Name: Cenovus Energy Inc.
License Number: 0201817
License Date: 1997-05-28
License Status: RecExempt
Spud Date: 1997-06-13
Final Drill Date: 1997-06-20
Well Total Depth: 1720.00 m
Surface Hole Latitude: 50.633122
Surface Hole Longitude: -111.027131

For data sources see[1][2]

Well History

Date Event
1997-05-28 Obtained License
1997-06-14 Surface Casing Operation Performed
1997-06-15 Direction Drilling Operation Performed - Horizontal
1997-06-18 Production Casing Operation Performed
1997-06-20 Finished Drilling
1997-06-20 Perforation Treatment Performed - Open-Hole Completion
1997-06-20 Well Mode changed to Drilled and Cased
1997-06-21 Rig Released
1997-06-30 Well Log Performed
1997-07-07 Well Log Performed
1997-07-17 Well Began Production
1997-07-17 Well Fluid changed to Crude Oil
1997-07-17 Well Mode changed to Pumping
2004-05-01 Well Fluid changed to Crude Oil
2004-05-01 Well Mode changed to Suspended
2007-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-03-04 Plug Back Performed
2007-03-04 Well Fluid changed to Crude Oil
2007-03-04 Well Mode changed to Abandoned Zone
2010-08-24 Perforation Treatment Performed - Cement Plug
2010-08-24 Plug Back Performed
2010-10-22 Well Abandoned
2010-10-22 Well Fluid changed to Crude Oil
2010-10-22 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-06-15 759.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-06-20 Open Hole/Barefoot Completion 1014.00 1720.00 0
2007-03-04 Packing Device Capped w/Cement 885.50 982.50 0
2010-08-24 Cement Plug 580.00 885.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 3292 0.0 0.0 0.0
1998 7236 0.0 0.0 0.0
1999 8735 0.0 0.0 0.0
2000 8367 0.0 0.0 0.0
2001 8657 0.0 0.0 0.0
2002 7636 0.0 0.0 0.0
2003 480 0.0 0.0 0.0

For data sources see[6]

References