X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0185021707000

Well Details

Well ID: 0185021707000
Loading map...
Location: 00/07-17-018-02W5/0
Location Alias: 00/07-17-18-02 W5M
Location Alias 2: 00/07-17-018-02 W5/00
Country: Canada
Province: Alberta
Township: 018
Meridian: 5
Range: 02
Section: 17
County/Municipality: Foothills County
Well Name: CPEC ROYALITE 50 TV 7-17-18-2
Operator Name: Crescent Point Energy Corp.
License Number: B0000086
License Date: 1939-12-01
License Status: Issued
Spud Date: 1940-01-08
Final Drill Date: 1940-05-12
Well Total Depth: 2374.40 m
Surface Hole Latitude: 50.519899
Surface Hole Longitude: -114.241130

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1939-12-01 Obtained License
1940-05-01 Production Casing Operation Performed
1940-05-12 Finished Drilling
1940-05-12 Perforation Treatment Performed - Open-Hole Completion
1940-05-12 Well Mode changed to Drilled and Cased
1940-05-13 Perforation Treatment Performed - Acid Wash - No Pressure
1940-05-14 Perforation Treatment Performed - Acid Wash - No Pressure
1940-05-15 Perforation Treatment Performed - Acid Wash - No Pressure
1940-05-21 Perforation Treatment Performed - Acid Wash - No Pressure
1940-05-22 Perforation Treatment Performed - Acid Wash - No Pressure
1940-05-25 Perforation Treatment Performed - Acid Wash - No Pressure
1940-05-27 Perforation Treatment Performed - Acid Wash - No Pressure
1940-05-30 Perforation Treatment Performed - Acid Wash - No Pressure
1940-05-30 Well Began Production
1940-05-30 Well Fluid changed to Crude Oil
1940-05-30 Well Mode changed to Flowing
1966-11-19 Well Fluid changed to Crude Oil
1966-11-19 Well Mode changed to Gas Lift
1968-12-16 Well Fluid changed to Crude Oil
1968-12-16 Well Mode changed to Pumping
1970-06-08 Perforation Treatment Performed - Acid Wash - No Pressure

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1940-05-12 Open Hole/Barefoot Completion 2241.20 2374.40 0
1970-06-08 Acid Wash 2264.70 2304.30 0
1970-06-08 Acid Wash 2334.80 2371.00 0
1940-05-13 Acid Wash 2241.20 2374.40 0
1940-05-14 Acid Wash 2241.20 2374.40 0
1940-05-15 Acid Wash 2241.20 2374.40 0
1940-05-21 Acid Wash 2241.20 2374.40 0
1940-05-22 Acid Wash 2241.20 2374.40 0
1940-05-25 Acid Wash 2241.20 2374.40 0
1940-05-27 Acid Wash 2241.20 2374.40 0
1940-05-30 Acid Wash 2241.20 2374.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 709 0.0 0.0 0.0
1968 3047 0.0 0.0 0.0
1969 8482 0.0 0.0 0.0
1970 8450 0.0 0.0 0.0
1971 8611 0.0 0.0 0.0
1972 8438 0.0 0.0 0.0
1973 8420 0.0 0.0 0.0
1974 8248 0.0 0.0 0.0
1975 8212 0.0 0.0 0.0
1976 8615 0.0 0.0 0.0
1977 7769 0.0 0.0 0.0
1978 7218 0.0 0.0 0.0
1979 8092 0.0 0.0 0.0
1980 8026 0.0 0.0 0.0
1981 7518 0.0 0.0 0.0
1982 8332 0.0 0.0 0.0
1983 6171 0.0 0.0 0.0
1984 4235 0.0 0.0 0.0
1985 8370 0.0 0.0 0.0
1986 8167 0.0 0.0 0.0
1987 6426 0.0 0.0 0.0
1988 8013 0.0 0.0 0.0
1989 7443 0.0 0.0 0.0
1990 7684 0.0 0.0 0.0
1991 8197 0.0 0.0 0.0
1992 8140 0.0 0.0 0.0
1993 7793 0.0 0.0 0.0
1994 7863 0.0 0.0 0.0
1995 8046 0.0 0.0 0.0
1996 7755 0.0 0.0 0.0
1997 8372 0.0 0.0 0.0
1998 8442 0.0 0.0 0.0
1999 8457 0.0 0.0 0.0
2000 7767 0.0 0.0 0.0
2001 8466 0.0 0.0 0.0
2002 8375 0.0 0.0 0.0
2003 8578 0.0 0.0 0.0
2004 8170 0.0 0.0 0.0
2005 8141 0.0 0.0 0.0
2006 8144 0.0 0.0 0.0
2007 8138 0.0 0.0 0.0
2008 8384 0.0 0.0 0.0
2009 2888 0.0 0.0 0.0
2010 8601 0.0 0.0 0.0
2011 8276 0.0 0.0 0.0
2012 8395 0.0 0.0 0.0
2013 5232 0.0 0.0 0.0
2014 8633 0.0 0.0 0.0
2015 8419 0.0 0.0 0.0
2016 8550 0.0 0.0 0.0
2017 8510 0.0 0.0 0.0
2018 7719 0.0 0.0 0.0
2019 8265 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References