X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0184302501000

Well Details

Well ID: 0184302501000
Loading map...
Location: 00/01-25-018-30W4/0
Location Alias: 00/01-25-18-30 W4M
Location Alias 2: 00/01-25-018-30 W4/00
Country: Canada
Province: Alberta
Township: 018
Meridian: 4
Range: 30
Section: 25
County/Municipality: Foothills County
Well Name: TEXACO C&E HIGH RIVER A-1-25
Operator Name: Imperial Oil Resources Limited
License Number: 0011876
License Date: 1956-07-18
License Status: Re-Entered
Spud Date: 1956-07-31
Final Drill Date: 1956-11-15
Well Total Depth: 3058.10 m
Surface Hole Latitude: 50.544681
Surface Hole Longitude: -113.991535

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-07-18 Obtained License
1956-09-21 Drill Stem Test Performed
1956-09-23 Drill Stem Test Performed
1956-09-26 Drill Stem Test Performed
1956-09-28 Drill Stem Test Performed
1956-10-09 Drill Stem Test Performed
1956-10-10 Drill Stem Test Performed
1956-11-02 Drill Stem Test Performed
1956-11-10 Drill Stem Test Performed
1956-11-15 Finished Drilling
1956-11-15 Production Casing Operation Performed
1956-11-15 Well Mode changed to Drilled and Cased
1956-11-16 Perforation Treatment Performed - Bullet Perforation
1956-11-23 Perforation Treatment Performed - Jet Perforation
1956-11-25 Perforation Treatment Performed - Jet Perforation
1956-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-11-30 Perforation Treatment Performed - Jet Perforation
1956-12-01 Perforation Treatment Performed - Cement Plug
1956-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-12-03 Perforation Treatment Performed - Jet Perforation
1956-12-08 Perforation Treatment Performed - Cement Squeeze
1956-12-10 Perforation Treatment Performed - Bullet Perforation
1956-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-12-13 Perforation Treatment Performed - Cement Squeeze
1956-12-16 Perforation Treatment Performed - Jet Perforation
1956-12-17 Well Began Production
1956-12-17 Well Fluid changed to Crude Oil
1956-12-17 Well Mode changed to Flowing
1971-07-19 Perforation Treatment Performed - Cement Plug
1971-07-19 Well Fluid changed to Crude Oil
1971-07-19 Well Mode changed to Abandoned
1971-07-20 Well Abandoned
1971-07-20 Well Fluid changed to Crude Oil
1971-07-20 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-11-16 Bullet Perforation 3025.70 3028.80 0
1956-12-03 Acid Treatment 2526.80 2540.50 0
1956-12-08 Cement Squeeze 2526.80 2540.50 0
1956-12-10 Bullet Perforation 2532.90 2542.00 20
1956-12-11 Acid Treatment 2532.90 2542.00 0
1956-12-12 Acid Treatment 2532.90 2542.00 0
1956-12-13 Cement Squeeze 2532.90 2542.00 0
1956-12-16 Perforation 2933.70 2937.70 13
1971-07-19 Cement Plug 2909.10 2930.20 0
1956-11-23 Perforation 3026.70 3029.70 26
1956-11-25 Perforation 3026.70 3029.70 26
1956-11-27 Acid Treatment 3025.70 3029.70 0
1956-11-28 Acid Treatment 3025.70 3029.70 0
1956-11-30 Perforation 3008.40 3021.20 13
1956-11-30 Acid Treatment 3008.40 3021.20 0
1956-12-01 Cement Plug 2956.60 2987.00 0
1956-12-03 Perforation 2526.80 2540.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 408 0.0 0.0 0.0
1969 2448 0.0 0.0 0.0
1970 2520 0.0 0.0 0.0
1971 744 0.0 0.0 0.0

For data sources see[5]

References