X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0184212612022

Well Details

Well ID: 0184212612022
Loading map...
Location: 02/12-26-018-21W4/2
Location Alias: 02/12-26-18-21 W4M
Location Alias 2: 02/12-26-018-21 W4/02
Country: Canada
Province: Alberta
Township: 018
Meridian: 4
Range: 21
Section: 26
County/Municipality: Vulcan County
Well Name: SURGE ENERGY QUEENSTN 12-26-18-21
Operator Name: Surge Energy Inc.
License Number: 0296470
License Date: 2003-11-19
License Status: Abandoned
Spud Date: 2003-11-24
Final Drill Date: 2003-12-02
Well Total Depth: 1513.00 m
Surface Hole Latitude: 50.550772
Surface Hole Longitude: -112.795731

For data sources see[1][2]

Well History

Date Event
2003-11-19 Obtained License
2003-11-25 Surface Casing Operation Performed
2003-11-27 Direction Drilling Operation Performed - Deviate
2003-12-02 Finished Drilling
2003-12-02 Well Log Performed
2003-12-02 Well Mode changed to Drilled and Cased
2003-12-03 Drill Stem Test Performed
2003-12-05 Production Casing Operation Performed
2003-12-05 Rig Released
2003-12-18 Perforation Treatment Performed - Jet Perforation
2003-12-19 Perforation Treatment Performed - Jet Perforation
2003-12-23 Well Began Production
2003-12-23 Well Fluid changed to Gas
2003-12-23 Well Mode changed to Flowing
2005-04-12 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2005-04-12 Plug Back Performed
2005-04-13 Perforation Treatment Performed - Jet Perforation
2005-07-06 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2005-07-06 Plug Back Performed
2005-07-07 Perforation Treatment Performed - Jet Perforation
2006-10-01 Well Fluid changed to Gas
2006-10-01 Well Mode changed to Suspended
2017-01-28 Perforation Treatment Performed - Jet Perforation
2017-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-01-29 Perforation Treatment Performed - Cement Squeeze
2017-01-29 Plug Back Performed
2017-01-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-01-31 Perforation Treatment Performed - Cement Squeeze
2017-01-31 Plug Back Performed
2017-01-31 Well Fluid changed to Gas
2017-01-31 Well Mode changed to Abandoned Zone
2018-10-20 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-11-27 1009.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-12-18 Perforation 1491.00 1494.00 17
2017-01-29 Packing Device Capped w/Cement 1413.50 1423.50 0
2017-01-31 Cement Squeeze 1200.00 1200.50 0
2017-01-31 Packing Device Capped w/Cement 1187.00 1197.00 0
2003-12-19 Perforation 1480.00 1481.50 17
2005-04-12 Packing Dev Cpd w/Res-Gyp Cem 1486.00 1489.00 0
2005-04-13 Perforation 1476.00 1478.00 17
2005-07-06 Packing Dev Cpd w/Res-Gyp Cem 1476.20 1479.20 0
2005-07-06 Packing Dev Cpd w/Res-Gyp Cem 1461.00 1469.00 0
2005-07-07 Perforation 1200.00 1202.50 17
2017-01-28 Perforation 1429.00 1431.00 17
2017-01-29 Cement Squeeze 1429.00 1431.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 190 0.0 0.0 0.0
2004 1610 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-31 No Incident Encountered 0.00 0.00

For data sources see[7]

References