If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0184180714005 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.51244,"lon":-112.46966,"icon":""}]} |
Location: 00/14-07-018-18W4/5 | |
Location Alias: 00/14-07-18-18 W4M | |
Location Alias 2: 00/14-07-018-18 W4/05 | |
Country: Canada | |
Province: Alberta | |
Township: 018 | |
Meridian: 4 | |
Range: 18 | |
Section: 07 | |
County/Municipality: Vulcan County | |
Well Name: TXNE 14D EYRMOR 14-7-18-18 | |
Operator Name: Torxen Energy Ltd. | |
License Number: 0270085 | |
License Date: 2002-05-17 | |
License Status: Issued | |
Spud Date: 2002-07-03 | |
Final Drill Date: 2002-07-06 | |
Well Total Depth: 1259.00 m | |
Surface Hole Latitude: 50.512440 | |
Surface Hole Longitude: -112.469660 |
Date | Event |
---|---|
2002-05-17 | Obtained License |
2002-07-03 | Surface Casing Operation Performed |
2002-07-06 | Finished Drilling |
2002-07-06 | Well Log Performed |
2002-07-06 | Well Mode changed to Drilled and Cased |
2002-07-07 | Production Casing Operation Performed |
2002-07-07 | Rig Released |
2002-07-28 | Perforation Treatment Performed - Jet Perforation |
2002-07-28 | Well Log Performed |
2002-08-09 | Perforation Treatment Performed - Fractured |
2002-08-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-08-21 | Perforation Treatment Performed - Jet Perforation |
2002-08-21 | Plug Back Performed |
2002-08-21 | Well Log Performed |
2002-09-09 | Perforation Treatment Performed - Fractured |
2002-09-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-09-18 | Perforation Treatment Performed - Jet Perforation |
2002-09-18 | Plug Back Performed |
2002-09-18 | Well Log Performed |
2002-10-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-10-13 | Plug Back Performed |
2002-10-13 | Well Log Performed |
2002-10-25 | Well Log Performed |
2002-10-26 | Perforation Treatment Performed - Jet Perforation |
2003-01-02 | Perforation Treatment Performed - Fractured |
2003-01-05 | Perforation Treatment Performed - Jet Perforation |
2003-01-06 | Perforation Treatment Performed - Fractured |
2003-01-07 | Well Fluid changed to Gas |
2003-01-07 | Well Mode changed to Testing |
2003-01-08 | Perforation Treatment Performed - Jet Perforation |
2003-01-12 | Perforation Treatment Performed - Fractured |
2004-04-29 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-07-28 | Perforation | 1228.50 | 1230.00 | 17 |
2002-10-26 | Perforation | 617.00 | 620.00 | 7 |
2003-01-02 | Fracture | 617.00 | 638.00 | 0 |
2003-01-05 | Perforation | 565.00 | 568.00 | 7 |
2003-01-05 | Perforation | 552.00 | 555.00 | 7 |
2003-01-05 | Perforation | 538.00 | 540.00 | 7 |
2003-01-06 | Fracture | 538.00 | 568.00 | 0 |
2003-01-08 | Perforation | 521.00 | 523.00 | 7 |
2003-01-08 | Perforation | 513.00 | 515.00 | 7 |
2003-01-08 | Perforation | 497.00 | 500.00 | 7 |
2003-01-12 | Fracture | 497.00 | 523.00 | 0 |
2002-08-09 | Fracture | 1228.50 | 1230.00 | 0 |
2002-08-21 | Packing Device Capped w/Cement | 1219.00 | 1227.00 | 0 |
2002-08-21 | Perforation | 1195.50 | 1197.00 | 17 |
2002-09-09 | Fracture | 1195.50 | 1197.00 | 0 |
2002-09-18 | Packing Device Capped w/Cement | 1186.00 | 1194.00 | 0 |
2002-09-18 | Perforation | 1147.00 | 1148.00 | 17 |
2002-10-13 | Packing Device Capped w/Cement | 1130.00 | 1138.00 | 0 |
2002-10-26 | Perforation | 636.00 | 638.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2003 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]