X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0184142416000

Well Details

Well ID: 0184142416000
Loading map...
Location: 00/16-24-018-14W4/0
Location Alias: 00/16-24-18-14 W4M
Location Alias 2: 00/16-24-018-14 W4/00
Country: Canada
Province: Alberta
Township: 018
Meridian: 4
Range: 14
Section: 24
County/Municipality: County of Newell
Well Name: PENGROWTH BANTRY 16-24-18-14
Operator Name: Cardinal Energy Ltd.
License Number: 0032890
License Date: 1967-10-11
License Status: Issued
Spud Date: 1967-10-13
Final Drill Date: 1967-10-16
Well Total Depth: 1041.20 m
Surface Hole Latitude: 50.541314
Surface Hole Longitude: -111.793976

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-10-11 Obtained License
1967-10-16 Finished Drilling
1967-10-16 Well Mode changed to Drilled and Cased
1967-10-17 Drill Stem Test Performed
1967-10-18 Production Casing Operation Performed
1967-10-19 Perforation Treatment Performed - Jet Perforation
1967-10-23 Well Began Production
1967-10-23 Well Fluid changed to Crude Oil
1967-10-23 Well Mode changed to Flowing
1967-12-15 Well Fluid changed to Crude Oil
1967-12-15 Well Mode changed to Pumping
1988-08-01 Well Fluid changed to Crude Oil
1988-08-01 Well Mode changed to Suspended
1988-11-02 Well Log Performed
1988-11-03 Perforation Treatment Performed - Cement Squeeze
1988-11-08 Perforation Treatment Performed - Jet Perforation
1988-11-08 Well Log Performed
1989-05-01 Well Began Injection
1989-05-01 Well Fluid changed to Water
1989-05-01 Well Type changed to Disposal
1994-09-13 Perforation Treatment Performed - Jet Perforation
1994-09-13 Well Log Performed
1994-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-10-19 Perforation 1022.30 1023.20 7
1988-11-03 Cement Squeeze 1022.30 1023.20 0
1988-11-08 Perforation 1027.10 1029.90 13
1994-09-13 Perforation 1022.30 1029.40 13
1994-10-12 Acid Treatment 1022.30 1029.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 1239 0.0 0.0 0.0
1968 6097 0.0 0.0 0.0
1969 7222 0.0 0.0 0.0
1970 8190 0.0 0.0 0.0
1971 8007 0.0 0.0 0.0
1972 8532 0.0 0.0 0.0
1973 5548 0.0 0.0 0.0
1974 6032 0.0 0.0 0.0
1975 7997 0.0 0.0 0.0
1976 8308 0.0 0.0 0.0
1977 8323 0.0 0.0 0.0
1978 8386 0.0 0.0 0.0
1979 8345 0.0 0.0 0.0
1980 6117 0.0 0.0 0.0
1981 7405 0.0 0.0 0.0
1982 6818 0.0 0.0 0.0
1983 6578 0.0 0.0 0.0
1985 5409 0.0 0.0 0.0
1986 7194 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References