X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0184131310000

Well Details

Well ID: 0184131310000
Loading map...
Location: 00/10-13-018-13W4/0
Location Alias: 00/10-13-18-13 W4M
Location Alias 2: 00/10-13-018-13 W4/00
Country: Canada
Province: Alberta
Township: 018
Meridian: 4
Range: 13
Section: 13
County/Municipality: County of Newell
Well Name: PENGROWTH BANTRY 10-13-18-13
Operator Name: Cardinal Energy Ltd.
License Number: 0025860
License Date: 1964-03-12
License Status: Abandoned
Spud Date: 1964-03-26
Final Drill Date: 1964-03-30
Well Total Depth: 1008.60 m
Surface Hole Latitude: 50.522426
Surface Hole Longitude: -111.663572

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-03-12 Obtained License
1964-03-30 Drill Stem Test Performed
1964-03-30 Finished Drilling
1964-03-30 Well Mode changed to Drilled and Cased
1964-03-31 Production Casing Operation Performed
1964-04-02 Perforation Treatment Performed - Jet Perforation
1964-04-05 Well Began Production
1964-04-05 Well Fluid changed to Crude Oil
1964-04-05 Well Mode changed to Flowing
1967-11-24 Perforation Treatment Performed - Jet Perforation
1967-12-04 Perforation Treatment Performed - Cement Squeeze
1967-12-06 Perforation Treatment Performed - Jet Perforation
1977-03-09 Well Fluid changed to Crude Oil
1977-03-09 Well Mode changed to Pumping
1993-04-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-04-27 Plug Back Performed
1993-04-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-04-28 Plug Back Performed
1993-04-28 Well Abandoned
1993-04-28 Well Fluid changed to Crude Oil
1993-04-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-04-02 Perforation 999.40 1000.40 13
1967-11-24 Perforation 995.20 995.50 13
1967-12-04 Cement Squeeze 995.20 995.50 0
1967-12-06 Perforation 998.50 998.80 13
1967-12-06 Perforation 999.10 1000.40 13
1993-04-27 Packing Device Capped w/Cement 973.30 981.30 0
1993-04-28 Packing Device Capped w/Cement 786.50 794.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2609 0.0 0.0 0.0
1968 3874 0.0 0.0 0.0
1969 7928 0.0 0.0 0.0
1970 7295 0.0 0.0 0.0
1971 8495 0.0 0.0 0.0
1972 5981 0.0 0.0 0.0
1973 7973 0.0 0.0 0.0
1974 5323 0.0 0.0 0.0
1975 2636 0.0 0.0 0.0
1977 6102 0.0 0.0 0.0
1978 7378 0.0 0.0 0.0
1979 6288 0.0 0.0 0.0
1980 3393 0.0 0.0 0.0
1981 8398 0.0 0.0 0.0
1982 8472 0.0 0.0 0.0
1983 8448 0.0 0.0 0.0
1984 8743 0.0 0.0 0.0
1985 7668 0.0 0.0 0.0
1986 8586 0.0 0.0 0.0
1987 8746 0.0 0.0 0.0
1988 7064 0.0 0.0 0.0
1989 8751 0.0 0.0 0.0
1990 5419 0.0 0.0 0.0

For data sources see[5]

References