X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0184130102000

Well Details

Well ID: 0184130102000
Loading map...
Location: 00/02-01-018-13W4/0
Location Alias: 00/02-01-18-13 W4M
Location Alias 2: 00/02-01-018-13 W4/00
Country: Canada
Province: Alberta
Township: 018
Meridian: 4
Range: 13
Section: 01
County/Municipality: County of Newell
Well Name: CARDINAL BANTRY 2-1-18-13
Operator Name: Cardinal Energy Ltd.
License Number: 0017583
License Date: 1959-08-14
License Status: Abandoned
Spud Date: 1959-08-16
Final Drill Date: 1959-08-22
Well Total Depth: 1014.10 m
Surface Hole Latitude: 50.486632
Surface Hole Longitude: -111.662741

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-08-14 Obtained License
1959-08-22 Finished Drilling
1959-08-22 Well Mode changed to Drilled and Cased
1959-08-23 Drill Stem Test Performed
1959-08-23 Production Casing Operation Performed
1959-09-03 Well Began Production
1959-09-03 Well Fluid changed to Crude Oil
1959-09-03 Well Mode changed to Flowing
1959-09-24 Perforation Treatment Performed - Jet Perforation
1960-04-21 Perforation Treatment Performed - Cement Squeeze
1960-04-23 Perforation Treatment Performed - Jet Perforation
1961-12-06 Perforation Treatment Performed - Cement Squeeze
1962-01-25 Perforation Treatment Performed - Jet Perforation
1962-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-04-06 Perforation Treatment Performed - Selective Jet Perforations
1962-04-07 Perforation Treatment Performed - Cement Squeeze
1962-04-09 Perforation Treatment Performed - Jet Perforation
1964-11-13 Well Fluid changed to Crude Oil
1964-11-13 Well Mode changed to Pumping
1988-05-05 Perforation Treatment Performed - Jet Perforation
2001-07-01 Well Fluid changed to Crude Oil
2001-07-01 Well Mode changed to Suspended
2010-07-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-07-09 Plug Back Performed
2010-07-09 Well Fluid changed to Crude Oil
2010-07-09 Well Log Performed
2010-07-09 Well Mode changed to Abandoned Zone
2012-07-22 Perforation Treatment Performed - Jet Perforation
2012-07-22 Well Log Performed
2012-07-23 Perforation Treatment Performed - Cement Plug
2012-07-23 Perforation Treatment Performed - Remedial Casing
2012-07-24 Perforation Treatment Performed - Jet Perforation
2012-07-24 Well Log Performed
2012-07-25 Perforation Treatment Performed - Cement Plug
2012-07-25 Perforation Treatment Performed - Remedial Casing
2012-07-26 Perforation Treatment Performed - Jet Perforation
2012-07-26 Well Log Performed
2012-07-27 Perforation Treatment Performed - Cement Plug
2012-07-27 Perforation Treatment Performed - Remedial Casing
2012-07-28 Perforation Treatment Performed - Jet Perforation
2012-07-28 Well Log Performed
2012-07-29 Perforation Treatment Performed - Cement Plug
2012-07-29 Perforation Treatment Performed - Remedial Casing
2012-07-30 Perforation Treatment Performed - Jet Perforation
2012-07-30 Well Log Performed
2012-07-31 Perforation Treatment Performed - Cement Plug
2012-07-31 Perforation Treatment Performed - Remedial Casing
2012-08-17 Well Abandoned
2012-08-17 Well Fluid changed to Crude Oil
2012-08-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-09-24 Perforation 990.90 991.80 13
1962-04-09 Perforation 991.50 992.70 0
1988-05-05 Perforation 990.90 992.10 13
2010-07-09 Packing Device Capped w/Cement 977.00 985.00 0
2012-07-22 Perforation 630.00 635.00 13
2012-07-23 Remedial Casing Cementing 630.00 635.00 0
2012-07-23 Cement Plug 539.00 850.00 0
2012-07-24 Perforation 420.00 425.00 13
2012-07-25 Remedial Casing Cementing 420.00 425.00 0
2012-07-25 Cement Plug 418.00 440.00 0
2012-07-26 Perforation 397.00 402.00 13
1960-04-21 Cement Squeeze 990.90 991.80 0
2012-07-27 Remedial Casing Cementing 397.00 402.00 0
2012-07-27 Cement Plug 266.00 417.00 0
2012-07-28 Perforation 251.00 256.00 13
2012-07-29 Remedial Casing Cementing 251.00 256.00 0
2012-07-29 Cement Plug 196.00 268.00 0
2012-07-30 Perforation 185.00 190.00 13
2012-07-31 Remedial Casing Cementing 185.00 190.00 0
2012-07-31 Cement Plug 128.00 190.00 0
1960-04-23 Perforation 990.90 991.20 13
1961-12-06 Cement Squeeze 990.90 991.20 0
1962-01-25 Perforation 990.90 991.80 13
1962-02-05 Acid Treatment 990.90 991.80 0
1962-04-06 Selective Jet Perforations 995.80 996.10 13
1962-04-06 Selective Jet Perforations 996.40 996.70 13
1962-04-07 Cement Squeeze 995.80 996.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3201 0.0 0.0 0.0
1968 3508 0.0 0.0 0.0
1969 7924 0.0 0.0 0.0
1970 8352 0.0 0.0 0.0
1971 7840 0.0 0.0 0.0
1972 6971 0.0 0.0 0.0
1973 8234 0.0 0.0 0.0
1974 7449 0.0 0.0 0.0
1975 6806 0.0 0.0 0.0
1976 6304 0.0 0.0 0.0
1977 8297 0.0 0.0 0.0
1978 8028 0.0 0.0 0.0
1979 7480 0.0 0.0 0.0
1980 6663 0.0 0.0 0.0
1981 8169 0.0 0.0 0.0
1982 6328 0.0 0.0 0.0
1983 8102 0.0 0.0 0.0
1984 8536 0.0 0.0 0.0
1985 8424 0.0 0.0 0.0
1986 8566 0.0 0.0 0.0
1987 8586 0.0 0.0 0.0
1988 8626 0.0 0.0 0.0
1989 8363 0.0 0.0 0.0
1990 8544 0.0 0.0 0.0
1991 6973 0.0 0.0 0.0
1992 8709 0.0 0.0 0.0
1993 8606 0.0 0.0 0.0
1994 7977 0.0 0.0 0.0
1995 8624 0.0 0.0 0.0
1996 8421 0.0 0.0 0.0
1997 8455 0.0 0.0 0.0
1998 8425 0.0 0.0 0.0
1999 7141 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References